Offshore Facilities and Pipeline Installation Methods
暂无分享,去创建一个
[1] Hubert Lecomte,et al. BP Marlin: First Flexible Pipelay With Newbuild Deepwater Pipelay Vessel , 2002 .
[2] J. D. Davidson,et al. Deepwater Installation of Pipelines and Risers by Towing , 2006 .
[3] Carl G. Langner,et al. Buckle Arrestors for Deepwater Pipelines , 1999 .
[4] John Hutchison,et al. Nile - Design and Qualification of Reeled Pipe in Pipe for Deepwater , 2001 .
[5] Michael Ambrose,et al. Design and Installation of Catenary Risers for the Baldpate Compliant Tower , 1999 .
[6] C. L. Hebert,et al. Deepwater Pipelaying Operations And Techniques Utilizing J-Lay Methods , 1994 .
[7] Richard Mercier,et al. GLOBAL DESIGN AND ANALYSIS OF THE AUGER TENSION LEG PLATFORM , 1994 .
[8] E. Corona,et al. On the Effect of the UOE Manufacturing Process on the Collapse Pressure of Long Tubes , 1991 .
[9] John Halkyard,et al. Spar Riser Alternatives for 10,000 ft Water Depth , 2002 .
[10] J. G. Mayfield,et al. Installation of the Bullwinkle Platform , 1989 .
[11] Stelios Kyriakides,et al. On the arresting efficiency of slip-on buckle arrestors for offshore pipelines , 2004 .
[12] James C. Edel,et al. Design of the Baldpate Compliant Tower , 1999 .
[13] Stelios Kyriakides,et al. Pipe Collapse Under Combined Pressure, Bending, and Tension Loads , 1989 .
[14] Frans Kopp,et al. Design And Installation Of Auger Pipelines , 1994 .
[15] James C. Edel,et al. An Overview of the Baldpate Project , 1999 .
[16] Gregory N. Gist,et al. Diana Subsea Production System: An Overview , 2001 .
[17] E. Corona,et al. On the effect of the U-O-E manufacturing process on the collapse pressure of long tubes , 1994 .
[18] G. Venkataraman. Reeled Risers: Deepwater and Dynamic Considerations , 2001 .
[19] G. V. Lever,et al. Terra Nova Development: Challenges and Lessons Learned , 2001 .
[20] J. J. Kenney,et al. Na Kika Hull Design Interface Management Challenges and Successes , 2004 .
[21] B. I. Tollin,et al. Deepwater Pipelay: Extending The Limits , 1994 .
[22] Pierre Bang. Girassol: The FPSO Presentation and Challenges , 2002 .
[23] E. L. Cook,et al. Installation of the Mardi Gras Pipeline Transportation System , 2004 .
[24] D. E. Calkins,et al. DESIGN, FABRICATION, AND INSTALLATION OF AUGER LMS AND TENDONS , 1994 .
[25] G. V. Lever,et al. The Terra Nova FPSO Turret Mooring System , 2001 .
[26] M. C. Moyer,et al. Hoover-Diana deepwater drilling and completions , 2001 .
[27] J. A. Newlin,et al. Na Kika - Deepwater Mooring and Host Installation , 2004 .
[28] Kent H. Stingl,et al. Design and Installation of the Na Kika Export Pipelines, Flowlines and Risers , 2004 .
[29] B. Kepp,et al. The Concrete Gravity Base Structure of the Gullfaks C Platform: Examples of Applied Technical Development , 1989 .
[30] P. W. Marshall,et al. THE DESIGN OF THE BULLWINKLE PLATFORM , 1989 .
[31] D. Perinet,et al. Development of Towing Techniques for Deepwater Flowlines and Risers , 2006 .
[32] J. P. Killeen,et al. Large Diameter SCR Delivery Challenges , 2005 .
[33] J-L. Colliat. Anchors for Deepwater to Ultradeepwater Moorings , 2002 .
[34] Paul Tricard,et al. Girassol Export Lines , 2002 .
[35] B. R. Campbell,et al. K2 Flowlines and Risers: From Design to Precommissioning , 2006 .
[36] Carl G. Langner,et al. DESIGN AND INSTALLATION OF AUGER STEEL CATENARY RISERS , 1994 .
[37] R. E. Kunzi,et al. Apache: first dynamically positioned, vertical reel pipelay ship , 1979 .
[38] Philippe Menier. Devils Tower Export Lines: 160 Miles of 18" OD Reeled Rigid Pipe , 2003 .
[39] Olivier Carré,et al. Riser Tower Installation , 2002 .
[40] J. S. Smith,et al. AUGER TLP DESIGN, FABRICATION, AND INSTALLATION OVERVIEW , 1994 .
[41] Massimo Pulici,et al. Deep Water Sealines Installation By Using the J-lay Method - The Blue Stream Experience , 2003 .
[42] Timothy T. Arthur,et al. Diana / Hoover Installation: Overview , 2001 .
[43] William McDonald,et al. Mardi Gras Transportation System Overview , 2004 .
[44] Brian M. McShane,et al. Mardi Gras Deepwater Pipeline Design Overview , 2004 .
[45] Nils Sødahl,et al. Reeling and J-Lay Installation of SCR's on Roncador Field , 2001 .
[46] Theodoro A. Netto,et al. Fatigue performance of pre-strained pipes with girth weld defects: Full-scale experiments and analyses , 2008 .
[47] T. Ley,et al. Pulling and Towing of Pipelines and Bundles , 2006 .
[48] B. F. Thurmond,et al. Challenges and Decisions in Developing Multiple Deepwater Fields , 2004 .
[49] Stelios Kyriakides,et al. On the design of integral buckle arrestors for offshore pipelines , 1998 .
[50] A. Serceau,et al. The Girassol Development: Project Challenges , 2002 .
[51] R. J. Brown,et al. Past, Present, and Future Towing of Pipelines and Risers , 2006 .
[52] W. H. Luyties,et al. Na Kika - Novel Development in Record Water Depth , 2004 .
[53] Subrata K. Chakrabarti,et al. Handbook of Offshore Engineering , 2005 .
[54] E. P. Heerema. Recent Achievements and Present Trends in Deepwater Pipe-Lay Systems , 2005 .
[55] G. H. Sterling,et al. The Bullwinkle Project: An Overview , 1989 .
[56] Dick Wolbers,et al. Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder , 2003 .
[57] Ralf Peek,et al. Loading History Effects for Deep-Water S-Lay of Pipelines , 2004 .
[58] B. D. Boles,et al. Kizomba A and B: Projects Overview , 2006 .
[59] D. W. Allen,et al. Auger TLP Well Systems , 1994 .
[60] A. C. Walker,et al. A Design Basis for the J-Tube Method of Riser Installation , 1983 .
[61] T. P. Freckelton,et al. Subsurface-development challenges in the ultradeepwater Na Kika development , 2004 .
[62] T. M. Hsu,et al. Matterhorn Steel Catenary Risers: Critical Issues and Lessons Learned for Reel-Layed SCRs to a TLP , 2004 .
[63] M. Lamey,et al. Red Hawk Project: Overview and Project Management , 2005 .
[64] Jacky Rouillon. Girassol - The Umbilicals and Flowlines - Presentation and challenges , 2002 .
[65] T. I. Tjelta,et al. THE SKIRT PILED GULLFAKS C PLATFORM INSTALLATION , 1990 .
[66] Roberto Faldini. S7000: A New Horizon , 1999 .