Intelligent Planning Reliability-Based Inspections of Fatigued Structures for the Crack Initiation Period in the Weibull Case under Parametric Uncertainty
暂无分享,去创建一个
[1] A. K. Shahani,et al. An Inspection Policy for the Weibull Case , 1973 .
[2] F. Zaïri,et al. Multiaxial fatigue life prediction of rubber-like materials using the continuum damage mechanics approach , 2010 .
[3] A. G. Munford. Comparison among Certain Inspection Policies , 1981 .
[4] Nicholas A. Nechval,et al. Inspection Policies in Service of Fatigued Aircraft Structures , 2011 .
[5] Nicholas A. Nechval,et al. Optimal Adaptive Inspection Planning Process in Service of Fatigued Aircraft Structures , 2009, ASMTA.
[6] R. Brook,et al. Cumulative Damage in Fatigue: A Step towards Its Understanding , 1969 .
[7] Bhaskar Sengupta,et al. Inspection Procedures when Failure Symptoms Are Delayed , 1980, Oper. Res..
[8] Richard E. Barlow,et al. Optimum Checking Procedures , 1963 .
[9] H. Luss,et al. Inspection Policies When Duration of Checkings is Non-Negligible , 1974 .
[10] Nicholas A. Nechval,et al. Estimation of warranty period for structural components of aircraft , 2004 .
[11] Nicholas A. Nechval,et al. Statistical Models For Prediction Of The Fatigue Crack Growth InAircraft Service , 2003 .
[12] Nicholas A. Nechval,et al. Stochastic Fatigue Models for Efficient Planning Inspections in Service of Aircraft Structures , 2008, ASMTA.
[13] H. O. Fuchs,et al. Metal fatigue in engineering , 2001 .
[14] Pandu R. Tadikamalla,et al. An Inspection Policy for the Gamma Failure Distributions , 1979 .
[15] Nicholas A. Nechval,et al. Improved estimation of state of stochastic systems via invariant embedding technique , 2008 .
[16] A. G. Munford,et al. A Nearly Optimal Inspection Policy , 1972 .