Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA and also twoother factors namely project phase weights and risks weights. These two factors inaddition to risk priority number (RPN) factors can lead to the application of betterrisk management. Based on the project risk magnitude, the appropriate risk responseshould be selected. The proposed model covers three parts of risk managementprocess: 1. Risk identification, 2. Quantitative risk analysis and 3. Risk responseplanning. Finally, this model was applied by a numerical example, and project riskmagnitude was calculated for an assumed company, to verify the proposed method.

[1]  Joseph H. M. Tah,et al.  A fuzzy approach to constuction project risk assessment and analysis: construction project risk management system , 2001 .

[2]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[3]  Paul N. Sharratt,et al.  A life-cycle framework to analyse business risk in process industry projects , 2002 .

[4]  David de la Fuente,et al.  A decision support system for applying failure mode and effects analysis , 2002 .

[5]  Zhi Chen,et al.  Preliminary safety research for CH HCSB TBM based on FMEA method , 2008 .

[6]  Masood A. Badri,et al.  A combined AHP}GP model for qualitycontrol sy stems , 2001 .

[7]  Davide Aloini,et al.  Risk management in ERP project introduction: Review of the literature , 2007, Inf. Manag..

[8]  Te-lung Tsai Risk Identification in Major Weapon Systems Acquisition in the Republic of China Air Force , 1992 .

[9]  S. M. Macgill,et al.  A new paradigm for risk analysis , 2005 .

[10]  Dinesh Kumar,et al.  Predicting uncertain behavior of industrial system using FM - A practical case , 2008, Appl. Soft Comput..

[11]  Celso Marcelo Franklin Lapa,et al.  Fuzzy FMEA applied to PWR chemical and volume control system , 2004 .

[12]  Da Ruan,et al.  Fuzzy group decision-making for facility location selection , 2003, Inf. Sci..

[13]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[14]  Irem Dikmen,et al.  An analytic hierarchy process based model for risk and opportunity assessment of international construction projects , 2006 .

[15]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[16]  P. F. Frutuoso e Melo,et al.  A fuzzy data envelopment analysis approach for FMEA , 2005 .

[17]  Zaifang Zhang,et al.  Risk prioritization in failure mode and effects analysis under uncertainty , 2011, Expert Syst. Appl..

[18]  Metin Dağdeviren,et al.  Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management , 2008, Inf. Sci..

[19]  Ali Jaafari,et al.  Management of risks, uncertainties and opportunities on projects: time for a fundamental shift , 2001 .

[20]  Vital Aelion,et al.  Life cycle inventory analysis of chemical processes , 1995 .

[21]  Seung J. Rhee,et al.  Using cost based FMEA to enhance reliability and serviceability , 2003, Adv. Eng. Informatics.

[22]  Marcello Braglia,et al.  Fuzzy TOPSIS approach for failure mode, effects and criticality analysis , 2003 .

[23]  Kin Keung Lai,et al.  Risk avoidance in bidding for software projects based on life cycle management theory , 2006 .

[24]  Dorota Kuchta,et al.  Use of fuzzy numbers in project risk (criticality) assessment , 2001 .

[25]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[26]  Peter Tavner,et al.  Failure Modes and Effects Analysis (FMEA) for wind turbines. , 2010 .

[27]  Jian-Bo Yang,et al.  Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean , 2009, Expert Syst. Appl..

[28]  Tzvi Raz,et al.  Use and benefits of tools for project risk management , 2001 .

[29]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[30]  C. Kahraman,et al.  Fuzzy multi-attribute equipment selection based on information axiom , 2005 .

[31]  Loon Ching Tang,et al.  Fuzzy assessment of FMEA for engine systems , 2002, Reliab. Eng. Syst. Saf..

[32]  Samaneh Shokravi,et al.  An ontology approach to support FMEA studies , 2009, 2009 Annual Reliability and Maintainability Symposium.

[33]  Ludmil Mikhailov,et al.  A fuzzy programming method for deriving priorities in the analytic hierarchy process , 2000, J. Oper. Res. Soc..

[34]  T. Saaty,et al.  Fundamentals of the analytic network process — Dependence and feedback in decision-making with a single network , 2004 .

[35]  F. Chan,et al.  Global supplier development considering risk factors using fuzzy extended AHP-based approach , 2007 .

[36]  Geoff Conroy,et al.  ConSERV, a project specific risk management concept , 1998 .

[37]  Jin Wang,et al.  Modified failure mode and effects analysis using approximate reasoning , 2003, Reliab. Eng. Syst. Saf..