Qualification management and its impact on capacity optimization
暂无分享,去创建一个
[1] James P. Ignizio. Cycle time reduction via machine-to-operation qualification , 2009 .
[2] S. Dauzere-Peres,et al. Importance of Qualification Management for Wafer Fabs , 2007, 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference.
[3] John W. Fowler,et al. Machine qualification management for a semiconductor back-end facility , 2010, Proceedings of the 2010 Winter Simulation Conference.
[4] Carl Johnzén,et al. Modeling and optimizing flexible capacity allocation in semiconductor manufacturing , 2009 .
[5] Marie-Laure Espinouse,et al. Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint , 2008, Eur. J. Oper. Res..
[6] A. Aubry,et al. Robust Load-Balanced Configuration With Fixed Costs For The Parallel Multi-Purpose Machines Problem , 2006, 2006 International Conference on Service Systems and Service Management.
[7] Stéphane Dauzère-Pérès,et al. Flexibility measures for qualification management in wafer fabs , 2011 .