The relative significance of forecast errors in multistage manufacturing

Abstract It is intuitive that controlling forecast errors should result in better customer service and lower inventories. But forecast errors come from various sources. Multistage manufacturing experiences supply and lead-time uncertainties as well as demand uncertainties, and manufacturing has more than one lever to pull when addressing these uncertainties. The relationship of forecast errors to manufacturing performance is not clear. Furthermore, the pursuit of forecast accuracy may not be the best use of managerial resources. In this study, using a many-factored manufacturing simulation, we examine two components of forecast errors, the mix of special and standard products, lot-sizing, and buffering policies as they affect inventories and customer service. Although most conclusions are situation dependent, reducing forecast bias is shown to be much preferred to reducing forecast variability, bias management is more important to on-time delivery than to inventory reduction, and the value of such reductions is particularly important in situations where there are large lot-sizes and small buffers.

[1]  T. S. Lee,et al.  AN EVALUATION OF FORECAST ERROR IN MASTER PRODUCTION SCHEDULING FOR MATERIAL REQUIREMENTS PLANNING SYSTEMS. , 1987 .

[2]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[3]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[4]  Manoj K. Malhotra,et al.  Resource Flexibility Issues in Multistage Manufacturing , 1990 .

[5]  Joseph R. Biggs,et al.  THE EFFECT AND COST OF FORECAST ERROR BIAS FOR MULTIPLE‐STAGE PRODUCTION‐INVENTORY SYSTEMS , 1982 .

[6]  L. Krajewski,et al.  Manufacturing performance--pulling the right levers. , 1984 .

[7]  Urban Wemmerlöv,et al.  The behavior of lot-sizing procedures in the presence of forecast errors , 1989 .

[8]  L. V. Wassenhove,et al.  COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING , 1983 .

[9]  E. H. Bowman Consistency and Optimality in Managerial Decision Making , 1963 .

[10]  Nick T. Thomopoulos,et al.  Applied Forecasting Methods , 1980 .

[11]  Urban Wemmerlüv COMMENTS ON “COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING”: A VERIFICATION OF ORDERING PROBABILITIES , 1985 .

[12]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[13]  Deven Sharma,et al.  Manufacturing strategy : an empirical analysis / , 1987 .

[14]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .