Contractor Capacity and Waste Generation: An Empirical Investigation

This paper aims to test the hypothesis that an inverse relationship exists between the capacity of a contractor and the amount of waste generated in a construction site. In Sri Lanka, contractors are graded by an independent government agency and this study uses 15 projects undertaken by grade M1 to M5 contractors. M1 contractors constitute the highest grade and they have higher technical, financial and managerial capabilities. These projects are examined to determine cement wastages and link them to these respective grades to clarify their relationship. The major finding is that upper grade contractors, who are more capable, generate less waste compared to their lower grade counterparts. This suggests that contractor capacity not only has desirable outcomes for better time, cost and quality objectives but also benefits the environmental objectives of their clients. While the present grading system in Sri Lanka does not consider waste management, it is suggested that the waste management practices of contractors could vary immensely from the M1 grade to the lower grades. Consequently, future revisions in the grading system should seriously consider incorporating waste management practices to provide an incentive to contractors who appropriately manage their waste. In theory, this will encourage efficient waste reduction practices in construction sites.

[1]  Shabbir H Gheewala,et al.  Estimation of construction waste generation and management in Thailand. , 2009, Waste management.

[2]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[3]  Vasantha Abeysekera FINANCING CONSTRUCTION WORK , 2012 .

[4]  Rawshan Ara Begum,et al.  A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .

[5]  P. Graham,et al.  Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation , 2000 .

[6]  M Osmani,et al.  Architects' perspectives on construction waste reduction by design. , 2008, Waste management.

[7]  Khairulzan Yahya,et al.  Eco‐costing of construction waste , 2006 .

[8]  Odysseus G. Manoliadis,et al.  Project Performance Indicators as an Innovative Tool for Identifying Sustainability Perspectives in Green Public Procurement , 2012 .

[9]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[10]  Kalle Kähkönen,et al.  Environmental index for Finnish construction sites , 2014 .

[11]  Martin Loosemore,et al.  A theory of waste behaviour in the construction industry , 2001 .

[12]  Rawshan Ara Begum,et al.  Attitude and behavioral factors in waste management in the construction industry of Malaysia , 2009 .

[13]  C. Poon Reducing construction waste. , 2007, Waste management.

[14]  Zhen Chen,et al.  An application of bar-code system for reducing construction wastes , 2002 .

[15]  P Agamuthu,et al.  Challenges in sustainable management of construction and demolition waste , 2008, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[16]  Weisheng Lu,et al.  Critical success factors for on-site sorting of construction waste: A china study , 2010 .

[17]  Andrew R.J. Dainty,et al.  Towards improved construction waste minimisation: a need for improved supply chain integration? , 2004 .

[18]  Hongping Yuan,et al.  Trend of the research on construction and demolition waste management. , 2011, Waste management.

[19]  O. O. Faniran,et al.  Minimizing waste on construction project sites , 1998 .

[20]  B. Kayis,et al.  The relative importance of tender evaluation and contractor selection criteria , 2010 .

[21]  Dilanthi Amaratunga,et al.  Attitudes and perceptions of construction workforce on construction waste in Sri Lanka , 2006 .

[22]  George Ofori,et al.  CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .

[23]  Nayanthara De Silva,et al.  Use of PC elements for waste minimization in the Sri Lankan construction industry , 2008 .

[24]  C. M. Tam,et al.  Mapping Approach for Examining Waste Management on Construction Sites , 2004 .

[25]  Davorin Kralj,et al.  Emerald Article: Innovative Systemic Approach for Promoting Sustainable Innovation for Zero Construction Waste Davorin Kralj Innovative Systemic Approach for Promoting Sustainable Innovation for Zero Construction Waste , 2022 .

[26]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .

[27]  Bon-Gang Hwang,et al.  Perception on benefits of construction waste management in the Singapore construction industry , 2011 .

[28]  Peter E.D. Love,et al.  AN ANALYSIS OF FACTORS INFLUENCING WASTE MINIMISATION AND USE OF RECYCLED MATERIALS FOR THE CONSTRUCTION OF RESIDENTIAL BUILDINGS , 2003 .

[29]  John Saunders,et al.  Attitudes towards waste minimisation amongst labour only sub‐contractors , 2004 .

[30]  Sławomir Biruk,et al.  Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .

[31]  Raufdeen Rameezdeen,et al.  Influence of labour arrangement on construction material waste generation , 2014 .

[32]  Roman Jaques Construction Site Waste Generation—The Influence of Design and Procurement , 1999 .

[33]  Richard Fellows,et al.  The contributions of environmental management systems towards project outcome: Case studies in Hong Kong , 2012 .

[34]  Vivian W. Y Tam,et al.  Controlling construction waste by implementing governmental ordinances in Hong Kong , 2007 .

[35]  Vivian W Y Tam,et al.  On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.

[36]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[37]  Weisheng Lu,et al.  An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.

[38]  J. K. Yates Sustainable methods for waste minimisation in construction , 2013 .

[39]  Peter E. D. Love,et al.  Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..

[40]  Nilay Cosgun,et al.  A study conducted to reduce construction waste generation in Turkey , 2007 .

[41]  Raufdeen Rameezdeen,et al.  Impact of Labour Arrangements on Construction Material Waste Generation , 2014 .

[42]  Leonhard E. Bernold,et al.  Source evaluation of solid waste in building construction , 1994 .