Contractor Capacity and Waste Generation: An Empirical Investigation
暂无分享,去创建一个
Dilanthi Amaratunga | Raufdeen Rameezdeen | Krisanthi Seneviratne | R. Rameezdeen | D. Amaratunga | K. Seneviratne
[1] Shabbir H Gheewala,et al. Estimation of construction waste generation and management in Thailand. , 2009, Waste management.
[2] Albert P.C. Chan,et al. Factors Affecting the Success of a Construction Project , 2004 .
[3] Vasantha Abeysekera. FINANCING CONSTRUCTION WORK , 2012 .
[4] Rawshan Ara Begum,et al. A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .
[5] P. Graham,et al. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation , 2000 .
[6] M Osmani,et al. Architects' perspectives on construction waste reduction by design. , 2008, Waste management.
[7] Khairulzan Yahya,et al. Eco‐costing of construction waste , 2006 .
[8] Odysseus G. Manoliadis,et al. Project Performance Indicators as an Innovative Tool for Identifying Sustainability Perspectives in Green Public Procurement , 2012 .
[9] Ghassan Aouad,et al. Performance management in construction: a conceptual framework , 2001 .
[10] Kalle Kähkönen,et al. Environmental index for Finnish construction sites , 2014 .
[11] Martin Loosemore,et al. A theory of waste behaviour in the construction industry , 2001 .
[12] Rawshan Ara Begum,et al. Attitude and behavioral factors in waste management in the construction industry of Malaysia , 2009 .
[13] C. Poon. Reducing construction waste. , 2007, Waste management.
[14] Zhen Chen,et al. An application of bar-code system for reducing construction wastes , 2002 .
[15] P Agamuthu,et al. Challenges in sustainable management of construction and demolition waste , 2008, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[16] Weisheng Lu,et al. Critical success factors for on-site sorting of construction waste: A china study , 2010 .
[17] Andrew R.J. Dainty,et al. Towards improved construction waste minimisation: a need for improved supply chain integration? , 2004 .
[18] Hongping Yuan,et al. Trend of the research on construction and demolition waste management. , 2011, Waste management.
[19] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[20] B. Kayis,et al. The relative importance of tender evaluation and contractor selection criteria , 2010 .
[21] Dilanthi Amaratunga,et al. Attitudes and perceptions of construction workforce on construction waste in Sri Lanka , 2006 .
[22] George Ofori,et al. CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .
[23] Nayanthara De Silva,et al. Use of PC elements for waste minimization in the Sri Lankan construction industry , 2008 .
[24] C. M. Tam,et al. Mapping Approach for Examining Waste Management on Construction Sites , 2004 .
[25] Davorin Kralj,et al. Emerald Article: Innovative Systemic Approach for Promoting Sustainable Innovation for Zero Construction Waste Davorin Kralj Innovative Systemic Approach for Promoting Sustainable Innovation for Zero Construction Waste , 2022 .
[26] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[27] Bon-Gang Hwang,et al. Perception on benefits of construction waste management in the Singapore construction industry , 2011 .
[28] Peter E.D. Love,et al. AN ANALYSIS OF FACTORS INFLUENCING WASTE MINIMISATION AND USE OF RECYCLED MATERIALS FOR THE CONSTRUCTION OF RESIDENTIAL BUILDINGS , 2003 .
[29] John Saunders,et al. Attitudes towards waste minimisation amongst labour only sub‐contractors , 2004 .
[30] Sławomir Biruk,et al. Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .
[31] Raufdeen Rameezdeen,et al. Influence of labour arrangement on construction material waste generation , 2014 .
[32] Roman Jaques. Construction Site Waste Generation—The Influence of Design and Procurement , 1999 .
[33] Richard Fellows,et al. The contributions of environmental management systems towards project outcome: Case studies in Hong Kong , 2012 .
[34] Vivian W. Y Tam,et al. Controlling construction waste by implementing governmental ordinances in Hong Kong , 2007 .
[35] Vivian W Y Tam,et al. On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.
[36] Christine Nadel,et al. Case Study Research Design And Methods , 2016 .
[37] Weisheng Lu,et al. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.
[38] J. K. Yates. Sustainable methods for waste minimisation in construction , 2013 .
[39] Peter E. D. Love,et al. Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..
[40] Nilay Cosgun,et al. A study conducted to reduce construction waste generation in Turkey , 2007 .
[41] Raufdeen Rameezdeen,et al. Impact of Labour Arrangements on Construction Material Waste Generation , 2014 .
[42] Leonhard E. Bernold,et al. Source evaluation of solid waste in building construction , 1994 .