An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
暂无分享,去创建一个
[1] Iris F. A. Vis,et al. Transshipment of containers at a container terminal: An overview , 2003, Eur. J. Oper. Res..
[2] Michel Bierlaire,et al. The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion , 2017, Eur. J. Oper. Res..
[3] Lixin Tang,et al. Research into container reshuffling and stacking problems in container terminal yards , 2015 .
[4] Lixin Tang,et al. Storage space allocation problem at inland bulk material stockyard , 2020 .
[5] Carlos F. Daganzo,et al. THE CRANE SCHEDULING PROBLEM , 1989 .
[6] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[7] Lixin Miao,et al. Quay crane scheduling with non-interference constraints in port container terminals , 2008 .
[8] Christian Bierwirth,et al. A fast heuristic for quay crane scheduling with interference constraints , 2009, J. Sched..
[9] Mark Goh,et al. An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem , 2014, Eur. J. Oper. Res..
[10] Matteo Fischetti,et al. Combinatorial Benders' Cuts for Mixed-Integer Linear Programming , 2006, Oper. Res..
[11] Ali Diabat,et al. Quay Crane Scheduling with Vessel Stability , 2018 .
[12] Yuanbin Song,et al. Optimization of Quay Crane Scheduling Constrained by Stability of Vessels , 2013 .
[13] Lixin Tang,et al. Data analytics and optimization for smart industry , 2020, Frontiers of Engineering Management.
[14] Ali H. Diabat,et al. A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints , 2017, Ann. Oper. Res..
[15] Lixin Tang,et al. A Benders decomposition-based framework for solving quay crane scheduling problems , 2019, Eur. J. Oper. Res..
[16] John N. Hooker,et al. Planning and Scheduling by Logic-Based Benders Decomposition , 2007, Oper. Res..
[17] Christian Bierwirth,et al. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals , 2015, Eur. J. Oper. Res..
[18] Chung-Yee Lee,et al. The Quay Crane Scheduling Problem With Stability Constraints , 2018, IEEE Transactions on Automation Science and Engineering.
[19] J. Hooker,et al. Logic-based Benders decomposition , 2003 .
[20] J. F. Benders. Partitioning procedures for solving mixed-variables programming problems , 1962 .
[21] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..
[22] Lei Wang,et al. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures , 2006 .
[23] Weimin Ma,et al. Quay crane scheduling with draft and trim constraints , 2017 .
[24] Gilbert Laporte,et al. A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal , 2006 .
[25] Pasquale Legato,et al. Modeling and solving rich quay crane scheduling problems , 2012, Comput. Oper. Res..
[26] Yongpei Guan,et al. The crane scheduling problem: models and solution approaches , 2013, Ann. Oper. Res..
[27] Christian Bierwirth,et al. A unified approach for the evaluation of quay crane scheduling models and algorithms , 2011, Comput. Oper. Res..
[28] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[29] Ali Diabat,et al. The Quay Crane Scheduling Problem , 2015 .
[30] Ali H. Diabat,et al. The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints , 2016, Comput. Ind. Eng..