Methodology to evaluate the monetary benefit of Probabilistic Risk Assessment by modeling the net value of Risk-Informed Applications at nuclear power plants

Abstract Probabilistic Risk Assessment (PRA) used in Nuclear Power Plants serves as a pillar of the U.S. Nuclear Regulatory Commission's Risk-Informed Regulatory framework, and is required for new reactor licenses to satisfy regulatory safety compliance. The benefits of PRA are not only experienced in terms of safety, but also from the monetary value derived from Risk-Informed Performance-Based Applications (RIPBAs), where risk estimated from PRA is utilized in decision making to expand the safe operational envelope of plants, leading to either an increase in profits or a reduction in costs. This paper introduces a methodology to evaluate this monetary value by the systematic causal modeling of the net value of RIPBAs and demonstrates the methodology for one of the RIPBAs, called Risk-Managed Technical Specifications (RMTS). The key steps of this methodology are: (i) Cost-Benefit Analysis to formulate the net value of PRA based on the net value of RIPBAs, (ii) Causal modeling to systematically model the operational scenarios leading to costs and benefits associated with RIPBAs, (iii) Uncertainty analysis, and (iv) Sensitivity analysis and validation. The results of this research could help decision makers with evaluating investment strategies in PRA that go ‘beyond-compliance’ to maximize industry profit while maintaining regulatory safety goals.

[1]  Vera Erguina Safety assured financial evaluation of maintenance , 2004 .

[2]  Zahra Mohaghegh,et al.  Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization , 2009, Reliab. Eng. Syst. Saf..

[3]  P. F. Frutuoso e Melo,et al.  A critical review of methods and models for evaluating organizational factors in Human Reliability Analysis , 2014 .

[4]  Zahra Mohaghegh Socio-Technical Risk Analysis , 2009 .

[5]  Toshimitsu Homma,et al.  A New Importance Measure for Sensitivity Analysis , 2010 .

[6]  Stephen M. Hess Risk managed technical specifications , 2009 .

[7]  Mohammad Modarres Advanced nuclear power plant regulation using risk-informed and performance-based methods , 2009, Reliab. Eng. Syst. Saf..

[8]  Paul Damien,et al.  Bayesian Nonparametric Analysis of Single Item Preventive Maintenance Strategies , 2009 .

[9]  K. Okamoto,et al.  A simple assessment scheme for severe accident consequences using release parameters , 2016 .

[10]  Zahra Mohaghegh,et al.  RoverD: Use of Test Data in GSI-191 Risk Assessment , 2016 .

[11]  Zahra Mohaghegh,et al.  Toward monitoring organizational safety indicators by integrating probabilistic risk assessment, socio-technical systems theory, and big data analytics , 2014 .

[12]  Raymond J. Kopp,et al.  Cost-Benefit Analysis and Regulatory Reform: An Assessment of the Science and the Art , 1997 .

[13]  Andrew Richards,et al.  Using Risk-Informed Asset Management for Feedwater System Preventative Maintenance Optimization , 2004 .

[14]  Cass R. Sunstein Worst-Case Scenarios , 2009 .

[15]  K. Arrow,et al.  Is There a Role for Benefit-Cost Analysis in Environmental, Health, and Safety Regulation? , 1996, Science.

[16]  Stephen M. Hess,et al.  Prioritizing Project Selection , 2009 .

[17]  A. Kinicki,et al.  Organizational Culture and Climate , 2003 .

[18]  Ernie Kee,et al.  Risk Managed Technical Specification Implementation at South Texas Project Units 1 and 2 , 2008 .

[19]  Justin Pence,et al.  Spatio-temporal socio-technical risk analysis methodology: An application in emergency response , 2017 .

[20]  Zahra Mohaghegh,et al.  Analyzing non-piping location-specific LOCA frequency for risk-informed resolution of generic safety issue 191 , 2015 .

[21]  Ajit Srividya,et al.  Importance measures in ranking piping components for risk informed in-service inspection , 2003, Reliab. Eng. Syst. Saf..

[22]  Judea Pearl,et al.  Probabilistic reasoning in intelligent systems - networks of plausible inference , 1991, Morgan Kaufmann series in representation and reasoning.

[23]  James K. Liming,et al.  Cost-Benefit-Risk Analysis Spreadsheets for Probabilistic Safety Assessment Applications , 1996 .

[24]  Zahra Mohaghegh,et al.  Incorporating organizational factors into probabilistic risk assessment of complex socio-technical systems: Principles and theoretical foundations , 2009 .

[25]  Zahra Mohaghegh Development of an aviation safety causal model using Socio-Technical Risk Analysis (SoTeRiA) , 2010 .

[26]  C. Clarke,et al.  Strategic risk management: the new competitive edge , 1999 .

[27]  Benjamin W. Spencer,et al.  Risk-informed assessment of degraded containment vessels , 2008 .

[28]  Zahra Mohaghegh-Ahmadabadi,et al.  On the theoretical foundations and principles of organizational safety risk analysis , 2007 .

[29]  Justin Pence,et al.  Quantifying organizational factors in human reliability analysis using the big data-theoretic algorithm , 2015 .

[30]  S. Shapiro The Evolution of Cost–Benefit Analysis in US Regulatory Decisionmaking , 2011 .

[31]  James K. Liming,et al.  Integrated Risk-Informed Asset Management for Commercial Nuclear Power Stations , 2002 .

[32]  D. E. Embrey,et al.  Incorporating management and organisational factors into probabilistic safety assessment , 1992 .

[33]  G. M. Holter,et al.  Technology, safety, and costs of decommissioning reference light-water reactors following postulated accidents. Appendices , 1982 .