Methodology to evaluate the monetary benefit of Probabilistic Risk Assessment by modeling the net value of Risk-Informed Applications at nuclear power plants
暂无分享,去创建一个
Justin Pence | Zahra Mohaghegh | Ernie Kee | Seyed Reihani | Marzieh Abolhelm | Mehmet Ertem | J. Pence | Z. Mohaghegh | E. Kee | S. Reihani | M. Ertem | Marzieh Abolhelm
[1] Vera Erguina. Safety assured financial evaluation of maintenance , 2004 .
[2] Zahra Mohaghegh,et al. Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization , 2009, Reliab. Eng. Syst. Saf..
[3] P. F. Frutuoso e Melo,et al. A critical review of methods and models for evaluating organizational factors in Human Reliability Analysis , 2014 .
[4] Zahra Mohaghegh. Socio-Technical Risk Analysis , 2009 .
[5] Toshimitsu Homma,et al. A New Importance Measure for Sensitivity Analysis , 2010 .
[6] Stephen M. Hess. Risk managed technical specifications , 2009 .
[7] Mohammad Modarres. Advanced nuclear power plant regulation using risk-informed and performance-based methods , 2009, Reliab. Eng. Syst. Saf..
[8] Paul Damien,et al. Bayesian Nonparametric Analysis of Single Item Preventive Maintenance Strategies , 2009 .
[9] K. Okamoto,et al. A simple assessment scheme for severe accident consequences using release parameters , 2016 .
[10] Zahra Mohaghegh,et al. RoverD: Use of Test Data in GSI-191 Risk Assessment , 2016 .
[11] Zahra Mohaghegh,et al. Toward monitoring organizational safety indicators by integrating probabilistic risk assessment, socio-technical systems theory, and big data analytics , 2014 .
[12] Raymond J. Kopp,et al. Cost-Benefit Analysis and Regulatory Reform: An Assessment of the Science and the Art , 1997 .
[13] Andrew Richards,et al. Using Risk-Informed Asset Management for Feedwater System Preventative Maintenance Optimization , 2004 .
[14] Cass R. Sunstein. Worst-Case Scenarios , 2009 .
[15] K. Arrow,et al. Is There a Role for Benefit-Cost Analysis in Environmental, Health, and Safety Regulation? , 1996, Science.
[16] Stephen M. Hess,et al. Prioritizing Project Selection , 2009 .
[17] A. Kinicki,et al. Organizational Culture and Climate , 2003 .
[18] Ernie Kee,et al. Risk Managed Technical Specification Implementation at South Texas Project Units 1 and 2 , 2008 .
[19] Justin Pence,et al. Spatio-temporal socio-technical risk analysis methodology: An application in emergency response , 2017 .
[20] Zahra Mohaghegh,et al. Analyzing non-piping location-specific LOCA frequency for risk-informed resolution of generic safety issue 191 , 2015 .
[21] Ajit Srividya,et al. Importance measures in ranking piping components for risk informed in-service inspection , 2003, Reliab. Eng. Syst. Saf..
[22] Judea Pearl,et al. Probabilistic reasoning in intelligent systems - networks of plausible inference , 1991, Morgan Kaufmann series in representation and reasoning.
[23] James K. Liming,et al. Cost-Benefit-Risk Analysis Spreadsheets for Probabilistic Safety Assessment Applications , 1996 .
[24] Zahra Mohaghegh,et al. Incorporating organizational factors into probabilistic risk assessment of complex socio-technical systems: Principles and theoretical foundations , 2009 .
[25] Zahra Mohaghegh. Development of an aviation safety causal model using Socio-Technical Risk Analysis (SoTeRiA) , 2010 .
[26] C. Clarke,et al. Strategic risk management: the new competitive edge , 1999 .
[27] Benjamin W. Spencer,et al. Risk-informed assessment of degraded containment vessels , 2008 .
[28] Zahra Mohaghegh-Ahmadabadi,et al. On the theoretical foundations and principles of organizational safety risk analysis , 2007 .
[29] Justin Pence,et al. Quantifying organizational factors in human reliability analysis using the big data-theoretic algorithm , 2015 .
[30] S. Shapiro. The Evolution of Cost–Benefit Analysis in US Regulatory Decisionmaking , 2011 .
[31] James K. Liming,et al. Integrated Risk-Informed Asset Management for Commercial Nuclear Power Stations , 2002 .
[32] D. E. Embrey,et al. Incorporating management and organisational factors into probabilistic safety assessment , 1992 .
[33] G. M. Holter,et al. Technology, safety, and costs of decommissioning reference light-water reactors following postulated accidents. Appendices , 1982 .