Measurement and verification of building systems under uncertain data: A Gaussian process modeling approach

Abstract Uncertainty in sensor data (e.g., weather, occupancy) complicates the construction of baseline models for measurement and verification (M&V). We present a Monte Carlo expectation maximization (MCEM) framework for constructing baseline Gaussian process (GP) models under uncertain input data. We demonstrate that the GP-MCEM framework yields more robust predictions and confidence levels compared with standard GP training approaches that neglect uncertainty. We argue that the approach can also reduce data needs because it implicitly expands the data range used for training and can thus be used as a mechanism to reduce data collection and sensor installation costs in M&V processes. We analyze the numerical behavior of the framework and conclude that robust predictions can be obtained with relatively few samples.

[1]  Galin L. Jones,et al.  Ascent‐based Monte Carlo expectation– maximization , 2005 .

[2]  Yeonsook Heo,et al.  Calibration of building energy models for retrofit analysis under uncertainty , 2012 .

[3]  Godfried Augenbroe,et al.  Uncertainty quantification of microclimate variables in building energy models , 2014 .

[4]  Yunong Zhang,et al.  Exploiting Hessian matrix and trust-region algorithm in hyperparameters estimation of Gaussian process , 2005, Appl. Math. Comput..

[5]  Carl E. Rasmussen,et al.  Gaussian processes for machine learning , 2005, Adaptive computation and machine learning.

[6]  Agathe Girard,et al.  Propagation of uncertainty in Bayesian kernel models - application to multiple-step ahead forecasting , 2003, 2003 IEEE International Conference on Acoustics, Speech, and Signal Processing, 2003. Proceedings. (ICASSP '03)..

[7]  G. C. Wei,et al.  A Monte Carlo Implementation of the EM Algorithm and the Poor Man's Data Augmentation Algorithms , 1990 .

[8]  MIHAI ANITESCU,et al.  A Matrix-free Approach for Solving the Parametric Gaussian Process Maximum Likelihood Problem , 2012, SIAM J. Sci. Comput..

[9]  É. Moulines,et al.  Convergence of a stochastic approximation version of the EM algorithm , 1999 .

[10]  J. Booth,et al.  Maximizing generalized linear mixed model likelihoods with an automated Monte Carlo EM algorithm , 1999 .

[11]  Wolfgang Jank,et al.  Implementing and Diagnosing the Stochastic Approximation EM Algorithm , 2006 .

[12]  Mark S. Martinez,et al.  International performance measurement & verification protocol: Concepts and options for determining energy and water savings , 2001 .

[13]  Victor M. Zavala,et al.  Inference of building occupancy signals using moving horizon estimation and Fourier regularization , 2014 .

[14]  Gersende Fort,et al.  Convergence of the Monte Carlo expectation maximization for curved exponential families , 2003 .

[15]  Victor M. Zavala,et al.  Gaussian process modeling for measurement and verification of building energy savings , 2012 .

[16]  Joaquin Quiñonero-Candela,et al.  Learning with Uncertainty: Gaussian Processes and Relevance Vector Machines , 2004 .

[17]  Victor M. Zavala,et al.  REAL-TIME RESOLUTION OF CONFLICTING OBJECTIVES IN BUILDING ENERGY , 2012 .

[18]  Roderick Murray-Smith,et al.  Gaussian Process priors with Uncertain Inputs: Multiple-Step-Ahead Prediction , 2002 .

[19]  D. Rubin,et al.  Maximum likelihood from incomplete data via the EM - algorithm plus discussions on the paper , 1977 .

[20]  Bin Yan,et al.  A Bayesian Approach For Predicting Building Cooling And Heating Consumption , 2013, Building Simulation Conference Proceedings.

[21]  V. Zavala Real-Time Optimization Strategies for Building Systems† , 2013 .

[22]  P Pieter-Jan Hoes,et al.  User behavior in whole building simulation , 2009 .

[23]  Thomas E Marlin,et al.  Process Control , 1995 .

[24]  Godfried Augenbroe,et al.  Uncertainty quantification of microclimate variables in building energy simulation , 2011 .