ConSERV, a project specific risk management concept
暂无分享,去创建一个
[1] Dan Remenyi,et al. Business process re-engineering: some aspects of how to evaluate and manage the risk exposure , 1996 .
[2] Geoff Conroy,et al. ConSERV, as a continual audit concept to provide traceability and accountability over the project life cycle , 1998 .
[3] R. Duda,et al. Expert Systems Research. , 1983, Science.
[4] C. V. Starkey. Engineering Design Decisions , 1993 .
[5] Hossein Soltan,et al. Negotiation in a knowledge‐based concurrent engineering design environment , 1995 .
[6] Walid Belassi,et al. A new framework for determining critical success/failure factors in projects , 1996 .
[7] J. R. Taylor,et al. Risk analysis for process plant, pipelines and transport , 1994 .
[8] Sipke Wadman,et al. Project and portfolio planning cycle: Project-based management for the multiproject challenge , 1994 .
[9] Mellers. Judgement and decision making , 1998 .
[10] Geoff Conroy,et al. ConSERV, a methodology for managing multi-disciplinary engineering design projects , 1997 .
[11] A. K. Munns,et al. The role of project management in achieving project success , 1996 .