A hybrid EDA with ACS for solving permutation flow shop scheduling
暂无分享,去创建一个
[1] Pedro Larrañaga,et al. Research topics in discrete estimation of distribution algorithms based on factorizations , 2009, Memetic Comput..
[2] Ching-Jong Liao,et al. An ant colony system for permutation flow-shop sequencing , 2004, Comput. Oper. Res..
[3] Chandrasekharan Rajendran,et al. Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs , 2004, Eur. J. Oper. Res..
[4] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[5] Thomas Stützle,et al. An Ant Approach to the Flow Shop Problem , 1998 .
[6] H. Mühlenbein,et al. From Recombination of Genes to the Estimation of Distributions I. Binary Parameters , 1996, PPSN.
[7] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[8] Christian Blum,et al. Ant colony optimization: Introduction and recent trends , 2005 .
[9] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[10] Shih-Wei Lin,et al. Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach , 2006 .
[11] Thomas Stützle,et al. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem , 2007, Eur. J. Oper. Res..
[12] É. Taillard. Some efficient heuristic methods for the flow shop sequencing problem , 1990 .
[13] Luca Maria Gambardella,et al. Ant colony system: a cooperative learning approach to the traveling salesman problem , 1997, IEEE Trans. Evol. Comput..
[14] Christos D. Tarantilis,et al. Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm , 2009, Comput. Oper. Res..
[15] Rubén Ruiz,et al. TWO NEW ROBUST GENETIC ALGORITHMS FOR THE FLOWSHOP SCHEDULING PROBLEM , 2006 .
[16] Ching-Jong Liao,et al. An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups , 2007, Comput. Oper. Res..
[17] Lionel Amodeo,et al. Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling , 2010, Comput. Oper. Res..
[18] Rubén Ruiz,et al. New high performing heuristics for minimizing makespan in permutation flowshops , 2009 .
[19] Orhan Engin,et al. Using ant colony optimization to solve hybrid flow shop scheduling problems , 2007 .
[20] N. R. Srinivasa Raghavan,et al. Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimization , 2009 .
[21] Bassem Jarboui,et al. An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems , 2009, Comput. Oper. Res..
[22] Rong-Hwa Huang,et al. Ant colony system for job shop scheduling with time windows , 2008 .
[23] Mohammad Mirabi,et al. Ant colony optimization technique for the sequence-dependent flowshop scheduling problem , 2011 .
[24] Chen Fang,et al. An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem , 2012, Comput. Oper. Res..