Parameters for the PEP-II B-Factory at SLAC in 2008

The PEP-II B-Factory at SLAC (3.1 GeV e{sup +} x 9.0 GeV e{sup -}) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. In the end PEP-II surpassed, by four times, its design luminosity reaching 1.21 x 10{sup 34} cm{sup -2}s{sup -1}. It also set world stored beam current records of 2.1 A e{sup -} and 3.2 A e{sup +}. Continuous injection was implemented with BaBar successfully taking data. The total delivered luminosity to the BaBar detector was 557.4 fb{sup -1} spanning five upsilon resonances. PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, the BaBar collaboration, and the US DOE OHEP.