ASSESSING STREAM CHANNEL STABILITY THRESHOLDS USING FLOW COMPETENCE ESTIMATES AT BANKFULL STAGE 1

ABSTRACT: Stream channel stability is affected by peak flows rather than average annual water yield. Timber harvesting and other land management activities that contribute to soil compaction, vegetation removal, or increased drainage density can increase peak discharges and decrease the recurrence interval of bankfull discharges. Increased peak discharges can cause more frequent movement of large streambed materials, leading to more rapid stream channel change or instability. This study proposes a relationship between increased discharge and channel stability, and presents a methodology that can be used to evaluate stream channel stability thresholds on a stream reach basis. Detailed surveys of the channel cross section, water surface slope, streambed particle size distribution, and field identification of bankfull stage are used to estimate existing bankfull flow conditions. These site specific stream channel characteristics are used in bed load movement formulae to predict critical flow conditions for entrainment of coarse bed material (D84 size fraction). The “relative bed stability” index, defined as the ratio of critical flow condition to the existing condition at bankfull discharge, can predict whether increased peak discharges will exceed stream channel thresholds.

[1]  C. Parrett,et al.  Mean annual runoff and peak flow estimates based on channel geometry of streams in northeastern and western Montana , 1983 .

[2]  D. Booth STREAM‐CHANNEL INCISION FOLLOWING DRAINAGE‐BASIN URBANIZATION , 1990 .

[3]  P. Carling,et al.  The concept of dominant discharge applied to two gravel-bed streams in relation to channel stability thresholds , 1988 .

[4]  P. Carling Threshold of coarse sediment transport in broad and narrow natural streams , 1983 .

[5]  F. Petit Dimensionless critical shear stress evaluation from flume experiments using different gravel beds , 1994 .

[6]  G. Williams Bank‐full discharge of rivers , 1978 .

[7]  M. Wolman,et al.  Magnitude and Frequency of Forces in Geomorphic Processes , 1960, The Journal of Geology.

[8]  R. Dennis Harr,et al.  Changes in storm hydrographs after road building and clear‐cutting in the Oregon Coast Range , 1975 .

[9]  Thomas A. McMahon,et al.  Stream Hydrology: An Introduction for Ecologists , 1997 .

[10]  M. Wolman A method of sampling coarse river‐bed material , 1954 .

[11]  G. Pickup,et al.  ADJUSTMENT OF STREAM-CHANNEL SHAPE TO HYDROLOGIC REGIME , 1976 .

[12]  R. Sidle Bed load transport regime of a small forest stream , 1988 .

[13]  R. D. Jarrett Hydraulics of High-Gradient Streams , 1984 .

[14]  J. D. Cheng Streamflow changes after clear-cut logging of a pine beetle-infested watershed in southern British C , 1989 .

[15]  E. Miller Sediment Yield and Storm Flow Response to Clear-Cut Harvest and Site Preparation in the Ouachita Mountains , 1984 .

[16]  G. Hollis The Effect of Urbanization on Floods of Different Recurrence Interval , 1975 .

[17]  R. Beschta,et al.  A model of two-phase bedload transport in an oregon coast range stream , 1982 .

[18]  S. J. Ursic Hydrologic Effects of Clearcutting and Stripcutting Loblolly Pine in the Coastal Plain , 1991 .

[19]  E. Andrews Entrainment of gravel from naturally sorted riverbed material , 1983 .

[20]  R. Ferguson Critical discharge for entrainment of poorly sorted gravel , 1994 .

[21]  R. King,et al.  THE EFFECT OF PARTIAL AND CLEARCUTTING ON STREAMFLOW AT DEADHORSE CREEK, COLORADO , 1987 .

[22]  D. Rosgen A classification of natural rivers , 1994 .

[23]  E. Andrews Effective and bankfull discharges of streams in the Yampa River basin, Colorado and Wyoming , 1980 .