Relating cost-benefit analysis results with transport project decisions in the Netherlands

This paper relates the cost-benefit analysis (CBA) results of transportation policy proposals in the Netherlands with the decision to implement or abandon the proposal. The aim of this study is to explore the relation between the CBA results and decision-making. Multinomial logit regression models and Latent Class Analysis are used in this paper as the statistical tools to identify associations between CBA results and decisions and to reveal unobservable classes underlying the CBA results and the decisions for projects. Analysis was carried out on 106 Netherlands CBA reports (2000–2012) containing 454 observations. Each observation is a CBA result of a transport project variant. In line with most of the international literature, this study cannot find a significant association between Net Present Values (NPVs) and the variants chosen in political decisions (after controlling for other relevant variables). However, a positive NPV does keep variants ‘pending’, preventing a negative decision.

[1]  D. McFadden The Revealed Preferences of a Government Bureaucracy: Theory , 1975 .

[2]  Maria Börjesson,et al.  The Use of Cost-benefit Analyses in Norway and Sweden: A Comparison , 2013 .

[3]  William C. Clark,et al.  Public Participation in Sustainability Science: Frontmatter , 2003 .

[4]  Rune Elvik,et al.  The barely revealed preference behind road investment priorities , 1997 .

[5]  James Odeck,et al.  Ranking of regional road investment in Norway , 1996 .

[6]  Bert Van Wee,et al.  Evaluating Transport Infrastructure Investments: The Dutch Experience with a Standardized Approach , 2007 .

[7]  James Odeck What Determines Decision‐Makers’ Preferences for Road Investments? Evidence from the Norwegian Road Sector , 2010 .

[8]  H Nakamura The economic evaluation of transport infrastructure: needs for international comparisons , 2000 .

[9]  G. Garrod,et al.  A review of cost–benefit analysis as applied to the evaluation of new road proposals in the U.K. , 1998 .

[10]  D. B. Lee,et al.  Methods for evaluation of transportation projects in the USA , 2000 .

[11]  Réjean Landry,et al.  Utilization of social science research knowledge in Canada , 2001 .

[12]  A. McCutcheon,et al.  Latent Class Analysis , 2021, Encyclopedia of Autism Spectrum Disorders.

[13]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[14]  P Mackie,et al.  Transport appraisal in other countries - lessons for the NATA refresh , 2007 .

[15]  John Nellthorp,et al.  The UK Roads Review--a hedonic model of decision making , 2000 .

[16]  S. Proost,et al.  When are subsidies to trans-European network projects justified? , 2011 .

[17]  Role of BCA in TIGER grant reviews: common errors and influence on the selection process , 2014, Journal of pediatric endocrinology & metabolism : JPEM.

[18]  J. Elíasson,et al.  Do Cost–Benefit Analyses Influence Transport Investment Decisions? Experiences from the Swedish Transport Investment Plan 2010–21 , 2012 .

[19]  C. D. Del Bo,et al.  Cost–Benefit Analysis and the Rates of Return of Infrastructure Projects: Evidence from International Organizations , 2010 .

[20]  Jan-Eric Nilsson INVESTMENT DECISIONS IN A PUBLIC BUREAUCRACY: A CASE STUDY OF SWEDISH ROAD PLANNING PRACTICES , 1991 .

[21]  D. McFadden The Revealed Preferences of a Government Bureaucracy: Empirical Evidence , 1976 .

[22]  B. Wee,et al.  Attitudes towards the role of Cost–Benefit Analysis in the decision-making process for spatial-infrastructure projects: A Dutch case study , 2013 .

[23]  W. Rogers Regression standard errors in clustered samples , 1994 .

[24]  Jay Magidson,et al.  Latent class models for clustering : a comparison with K-means , 2002 .

[25]  Yoshihiko Hayashi,et al.  International comparison of background concept and methodology of transportation project appraisal , 2000 .

[26]  T. Adams,et al.  A Statistical Analysis of the Role of Benefit–Cost Analysis in Awarding TIGER Grants , 2014 .

[27]  Cjj Eijgenraam,et al.  EVALUATION OF INFRASTRUCTURAL PROJECTS: GUIDE FOR COST-BENEFIT ANALYSIS , 2000 .

[28]  Jay Magidson,et al.  Technical Guide for Latent GOLD 5.1: Basic, Advanced, and Syntax 1 , 2016 .

[29]  Andrew M. Warner Cost - benefit analysis in World Bank projects , 2010 .