Introduction on Construction Techniques of Continuous Reinforced Concrete Pavement

Based on the "Technical Specification for Construction of Highway Cement Concrete Pavement"(JTG F30-2003),discuss the construction process of continuous reinforcement concrete pavement(CRCP),such as the condition of raw and processed materials and machine,the deal with of the grass roots,the construction of reinforcement installment and concrete etc.It can give reference for application of CRCP in China express application.