Applying Process Simulation Technique to Value Engineering Model: A Case Study of Hospital Building Project

Applying value engineering (VE) in a construction project has proven to be an effective way to save the cost of a project. Different VE models have been developed and used in construction projects in the past. One common attribute of construction projects is the dependence of a highly qualitative decision making process: capturing, interpreting, and quantifying expert's subjective judgment. This study proposes an advanced five-phase VE model, each phase of which consists of a series of steps to better quantify subjective opinions of VE team members. Construction simulation technique, the Cyclic Operation Network, is used as a means to minimize subjectivity in estimating the value of different alternatives in terms of time and cost savings. A case study shows that the advanced five-phase VE model improves analysis, assessment, and decision on VE. This new approach has a great potential to minimize subjectivity during VE process and improves VE decision-making process by using quantitatively derived data from the simulation analysis.

[1]  M. Halpin,et al.  Induced Voltage in Parallel Transmission Lines Caused by Electric Field Induction , 2006, ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance.

[2]  Alphonse J. Dell'Isola,et al.  Value engineering : practical applications --for design, construction, maintenance & operations , 1997 .

[3]  Ismail M. Basha,et al.  Value Engineering in Egyptian Bridge Construction , 1991 .

[4]  J.C. Martinez EZStrobe-general-purpose simulation system based on activity cycle diagrams , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[5]  Charles Y. J. Cheah,et al.  Appraisal of value engineering in construction in Southeast Asia , 2005 .

[6]  Stuart D. Green,et al.  Value engineering: the search for unnecessary cost , 1990 .

[7]  Larry W. Zimmerman,et al.  Value Engineering : A Practical Approach For Owners, Designers And Contractors , 1988 .

[8]  Abdul-Mohsen Al-Hammad,et al.  Value Engineering in the Assessment of Exterior Building Wall Systems , 1996 .

[9]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Hybrid value engineering: the challenge of construction project management in the 1990s , 1994 .

[10]  Núria Agell,et al.  Multiple-Criteria Evaluation for Value Management in Civil Engineering , 2005 .

[11]  Akintola Omigbodun,et al.  Value Engineering and Optimal Building Projects , 2001 .

[12]  Daniel W. Halpin,et al.  Planning and analysis of construction operations , 1992 .

[13]  Del L. Younker Value Engineering : Analysis And Methodology , 2003 .

[14]  Kristin E. Davis Finding value in the value engineering process , 2004 .

[15]  Vineet R. Kamat,et al.  General-purpose 3D animation with VITASCOPE , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..

[16]  Charles Pfrommer,et al.  Think Value Engineering , 1995 .

[17]  Steven Male,et al.  Holistic appraisal of value engineering in construction in United States , 1996 .

[18]  Alphonse J. Dell'Isola Value engineering in the construction industry , 1973 .

[19]  Michael J. Horman,et al.  Continuous Value Enhancement Process , 2005 .

[20]  James R. Wixson,et al.  THE HUMAN SIDE OF VALUE ENGINEERING , 1991 .

[21]  Qiping Shen,et al.  Critical Success Factors for Value Management Studies in Construction , 2003 .

[22]  James Jerome O'Brien Value analysis in design and construction , 1976 .

[23]  Sadi Assaf,et al.  COMPUTERIZED SYSTEM FOR APPLICATION OF VALUE ENGINEERING METHODOLOGY , 2000 .

[24]  Photios G. Ioannou,et al.  General purpose simulation with Stroboscope , 1994, Proceedings of Winter Simulation Conference.