A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems
暂无分享,去创建一个
[1] C. Saygin,et al. Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems , 1999 .
[2] Parul Jain,et al. An integrated scheme for process planning and scheduling in FMS , 2006 .
[3] F. Musharavati,et al. Enhanced simulated-annealing-based algorithms and their applications to process planning in reconfigurable manufacturing systems , 2012, Adv. Eng. Softw..
[4] Imed Kacem,et al. Genetic algorithm for the flexible job-shop scheduling problem , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).
[5] Ghorbanali Mohammadi,et al. A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing , 2012 .
[6] Napsiah Ismail,et al. Research Outline on Reconfigurable Manufacturing System Production Scheduling Employing Fuzzy Logic , 2012 .
[7] Liang Gao,et al. Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling , 2010, Comput. Oper. Res..
[8] Jerry Y. H. Fuh,et al. Integration of process planning and scheduling by exploring the flexibility of process planning , 2003 .
[9] Abderrahmane Bensmaine,et al. A non-dominated sorting genetic algorithm based approach for optimal machines selection in reconfigurable manufacturing environment , 2013, Comput. Ind. Eng..
[10] Hyoung-Ho Doh,et al. Scheduling for a Reconfigurable Manufacturing System with Multiple Process Plans and Limited Pallets/Fixtures , 2012 .
[11] Gavriel Salvendy,et al. Handbook of industrial engineering , 2001 .
[12] Ahmed Azab,et al. Mathematical Modeling for Reconfigurable Process Planning , 2007 .
[13] Liang Gao,et al. A Genetic Algorithm for Integration of Process Planning and Scheduling Problem , 2008, ICIRA.
[14] Abdul Rahman Ramli,et al. A Metaheuristic Approach to Manufacturing Process Planning in Reconfigurable Manufacturing Systems , 2008 .
[15] Hoda A. ElMaraghy,et al. A model for generating optimal process plans in RMS , 2008, Int. J. Comput. Integr. Manuf..
[16] Peter Ross,et al. A Promising Genetic Algorithm Approach to Job-Shop SchedulingRe-Schedulingand Open-Shop Scheduling Problems , 1993, ICGA.
[17] Yoram Koren,et al. Reconfigurable Manufacturing Systems , 2003 .
[18] Ahmed Azab,et al. Semi-Generative Macro-Process Planning For Reconfigurable Manufacturing , 2007 .
[19] Rakesh Kumar Phanden,et al. An approach for integration of process planning and scheduling , 2013, Int. J. Comput. Integr. Manuf..
[20] F. Musharavati. RECONFIGURABLE MANUFACTURING SYSTEMS , 2010 .
[21] Behrokh Khoshnevis,et al. Scheduling with flexible process plans , 1993 .
[22] Ricardo Galán,et al. Hybrid Heuristic Approaches for Scheduling in Reconfigurable Manufacturing Systems , 2008, Metaheuristics for Scheduling in Industrial and Manufacturing Applications.
[23] Takeshi Yamada,et al. Conventional Genetic Algorithm for Job Shop Problems , 1991, ICGA.
[24] S. Dashkovskiy,et al. Production Planning & Control , 2013 .
[25] N. J. Theron,et al. Process Planning for Reconfigurable Manufacturing System for Mould / Die Making , 2011 .
[26] Abderrahmane Bensmaine,et al. Process Plan Generation in Reconfigurable Manufacturing Systems using AMOSA and TOPSIS , 2012 .
[27] Manoj Kumar Tiwari,et al. An adapted NSGA-2 algorithm based dynamic process plan generation for a reconfigurable manufacturing system , 2012, J. Intell. Manuf..
[28] Mauricio G. C. Resende,et al. A hybrid genetic algorithm for the job shop scheduling problem , 2005, Eur. J. Oper. Res..
[29] Manoj Kumar Tiwari,et al. Realising process planning and scheduling integration through adaptive setup planning , 2013 .
[30] Liang Gao,et al. Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling , 2012, Expert Syst. Appl..
[31] Katsumi Morikawa,et al. Selecting an Optimal Production Order and Its Corresponding Configuration in a Reconfigurable Manufacturing System with Multiple Product Groups , 2006 .
[32] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .
[33] Abderrahmane Bensmaine,et al. Simulation-based NSGA-II approach for multi-unit process plans generation in reconfigurable manufacturing system , 2011, ETFA2011.
[34] Liang Gao,et al. Integrated process planning and scheduling using an imperialist competitive algorithm , 2012 .
[35] Nan Xie,et al. A Robust Scheduling for Reconfigurable Manufacturing System Using Petri Nets and Genetic Algorithm , 2006, 2006 6th World Congress on Intelligent Control and Automation.
[36] Yasuhiro Tsujimura,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .
[37] W. E. I. Ta N,et al. Integration of process planning and schedulingÐ a review , 2000 .
[38] Rakesh Kumar Phanden,et al. Integration of process planning and scheduling: a state-of-the-art review , 2011, Int. J. Comput. Integr. Manuf..
[39] Yoram Koren,et al. The Global Manufacturing Revolution: Product-Process-Business Integration and Reconfigurable Systems , 2010 .
[40] Behrokh Khoshnevis,et al. Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..
[41] Y. Guoa,et al. Applications of particle swarm optimisation in integrated process planning and scheduling , 2008 .