On-board Dynamic Scheduling with a Fuzzy Logic Inference Engine
暂无分享,去创建一个
[1] Barr and Feigenbaum Edward A. Avron,et al. The Handbook of Artificial Intelligence , 1981 .
[2] Alex Fukunaga,et al. Iterative Repair Planning for Spacecraft Operations Using the Aspen System , 2000 .
[3] Nicola Muscettola,et al. Design of the Remote Agent experiment for spacecraft autonomy , 1998, 1998 IEEE Aerospace Conference Proceedings (Cat. No.98TH8339).
[4] John Gasch,et al. A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities , 1998 .
[5] Siegfried Gottwald,et al. Fuzzy Sets and Fuzzy Logic , 1993 .
[6] Frederic Teston,et al. Proba: ESA's Autonomy and Technology Demonstration Mission , 1999 .
[7] Mark S. Fox,et al. Intelligent Scheduling , 1998 .
[8] T. L. Saaty. A Scaling Method for Priorities in Hierarchical Structures , 1977 .
[9] Steve Chien,et al. On Board Planning for Autonomous Spacecraft , 1999 .
[10] Alex Fukunaga,et al. Towards an application framework for automated planning and scheduling , 1997, 1997 IEEE Aerospace Conference.
[11] Juhani Koski,et al. Multicriteria Design Optimization , 1990 .
[12] Jonathan Gratch,et al. Producing Satisficing Solutions to Scheduling Problems: An Interactive Constraint Relaxation Approach , 1994, AIPS.