Cost-oriented robotic assembly line balancing problem with setup times: multi-objective algorithms
暂无分享,去创建一个
S. G. Ponnambalam | Zixiang Li | Mukund Nilakantan Janardhanan | S. Ponnambalam | Zixiang Li | M. Janardhanan
[1] Zeynel Abidin Çil,et al. A beam search approach for solving type II robotic parallel assembly line balancing problem , 2017, Appl. Soft Comput..
[2] Mostafa Zandieh,et al. A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks , 2011 .
[3] Peter Nielsen,et al. Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times , 2019, Applied Mathematical Modelling.
[4] Gregory Levitin,et al. A genetic algorithm for robotic assembly line balancing , 2006, Eur. J. Oper. Res..
[5] Peter Nielsen,et al. Mathematical model and metaheuristics for simultaneous balancing and sequencing of a robotic mixed-model assembly line , 2017 .
[6] Liping Zhang,et al. Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems , 2018, Int. J. Prod. Res..
[7] Abdolmajid Yolmeh,et al. An efficient hybrid genetic algorithm to solve assembly line balancing problem with sequence-dependent setup times , 2012, Comput. Ind. Eng..
[8] Liping Zhang,et al. Minimizing energy consumption and cycle time in two-sided robotic assembly line systems using restarted simulated annealing algorithm , 2016 .
[9] Marcus Ritt,et al. Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem , 2018, Eur. J. Oper. Res..
[10] Peter Nielsen,et al. Multi-objective co-operative co-evolutionary algorithm for minimizing carbon footprint and maximizing line efficiency in robotic assembly line systems , 2017 .
[11] Binghai Zhou,et al. An improved immune clonal selection algorithm for bi-objective robotic assemble line balancing problems considering time and space constraints , 2019, Engineering Computations.
[12] Majid Aminnayeri,et al. Type II robotic assembly line balancing problem: An evolution strategies algorithm for a multi-objective model , 2012 .
[13] E. Lenz,et al. RALB – A Heuristic Algorithm for Design and Balancing of Robotic Assembly Lines , 1993 .
[14] Rubén Ruiz,et al. Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study , 2013, Eur. J. Oper. Res..
[15] Masoud Rabbani,et al. Multi-objective metaheuristics for solving a type II robotic mixed-model assembly line balancing problem , 2016 .
[16] Nilanjan Dey,et al. Discrete cuckoo search algorithms for two-sided robotic assembly line balancing problem , 2017, Neural Computing and Applications.
[17] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[18] Matthias Amen,et al. Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds , 2006, Eur. J. Oper. Res..
[19] Nils Boysen,et al. The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics , 2013 .
[20] J. Mukund Nilakantan,et al. Robotic U-shaped assembly line balancing using particle swarm optimization , 2016 .
[21] Chaoyong Zhang,et al. Multi-objective artificial bee colony algorithm for simultaneous sequencing and balancing of mixed model assembly line , 2014 .
[22] Lionel Amodeo,et al. Solving a robotic assembly line balancing problem using efficient hybrid methods , 2014, J. Heuristics.
[23] Mojtaba Aghajani,et al. Balancing of robotic mixed-model two-sided assembly line with robot setup times , 2014 .
[24] Fei Zhang,et al. Multi-objective artificial bee colony algorithm for order oriented simultaneous sequencing and balancing of multi-mixed model assembly line , 2019, J. Intell. Manuf..
[25] Murat Şahin,et al. Increasing production rate in U-type assembly lines with sequence-dependent set-up times , 2017 .
[26] Mukund J Nilakantan,et al. Design of energy efficient RAL system using evolutionary algorithms , 2016 .
[27] Mitsuo Gen,et al. An efficient approach for type II robotic assembly line balancing problems , 2009, Comput. Ind. Eng..
[28] Mario Padron,et al. A methodology for cost‐oriented assembly line balancing problems , 2009 .
[29] Nima Hamta,et al. A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect , 2013 .
[30] Peter Nielsen,et al. Mathematical models and simulated annealing algorithms for the robotic assembly line balancing problem , 2018, Assembly Automation.
[31] S. G. Ponnambalam,et al. Differential evolution algorithm for solving RALB problem using cost- and time-based models , 2017 .
[32] Sungsoo Park,et al. A strong cutting plane algorithm for the robotic assembly line balancing problem , 1995 .
[33] S. G. Ponnambalam,et al. Model and metaheuristics for robotic two-sided assembly line balancing problems with setup times , 2019, Swarm Evol. Comput..
[34] Marcus Ritt,et al. A memetic algorithm for the cost-oriented robotic assembly line balancing problem , 2018, Comput. Oper. Res..
[35] Yuval Cohen,et al. The sliding frame - extending the concept to various assembly line balancing problems , 2010, Int. J. Manuf. Technol. Manag..
[36] Adil Baykasoğlu,et al. Modeling and solving mixed-model assembly line balancing problem with setups. Part II: A multiple colony hybrid bees algorithm , 2014 .
[37] Liping Zhang,et al. Mathematical model and grey wolf optimization for low-carbon and low-noise U-shaped robotic assembly line balancing problem , 2019, Journal of Cleaner Production.
[38] Adil Baykasoglu,et al. Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks , 2013, Appl. Soft Comput..
[39] N. Jawahar,et al. Bio-inspired search algorithms to solve robotic assembly line balancing problems , 2014, Neural Computing and Applications.
[40] Hadi Gökçen,et al. A multiple rule-based genetic algorithm for cost-oriented stochastic assembly line balancing problem , 2018, Assembly Automation.
[41] Zeynel Abidin Çil,et al. Analysis of the type II robotic mixed-model assembly line balancing problem , 2017 .
[42] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[43] Nilanjan Dey,et al. Mathematical models and migrating birds optimization for robotic U-shaped assembly line balancing problem , 2019, Neural Computing and Applications.
[44] Matthias Amen,et al. Heuristic methods for cost-oriented assembly line balancing: A survey , 2000 .
[45] Carlos Andrés,et al. Balancing and scheduling tasks in assembly lines with sequence-dependent setup times , 2008, Eur. J. Oper. Res..
[46] Uğur Özcan,et al. Balancing two-sided assembly lines with sequence-dependent setup times , 2010 .
[47] Adil Baykasoğlu,et al. Modeling and solving mixed-model assembly line balancing problem with setups. Part I: A mixed integer linear programming model , 2014 .
[48] Nils Boysen,et al. The sequence-dependent assembly line balancing problem , 2008, OR Spectr..
[49] Parviz Fattahi,et al. Cost-oriented two-sided assembly line balancing problem: A simulated annealing approach , 2012, Int. J. Comput. Integr. Manuf..
[50] Uğur Özcan,et al. Balancing and scheduling tasks in parallel assembly lines with sequence-dependent setup times , 2019, International Journal of Production Economics.
[51] S. G. Ponnambalam,et al. An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems , 2015 .
[52] Yilmaz Delice,et al. A genetic algorithm approach for balancing two-sided assembly lines with setups , 2019, Assembly Automation.
[53] Peter Nielsen,et al. Co-evolutionary particle swarm optimization algorithm for two-sided robotic assembly line balancing problem , 2016 .
[54] Sadegh Niroomand,et al. Solving a new cost-oriented assembly line balancing problem by classical and hybrid meta-heuristic algorithms , 2019, Neural Computing and Applications.
[55] Matthias Amen,et al. Heuristic methods for cost-oriented assembly line balancing: a comparison on solution quality and computing time , 2001 .