General Layout Plan of Dredged-in Basin at Nantong Port Lusi Harbor

Based on oceanographic data,sediment observation data and model testing result,full discussion is made to determine the feasibility of onshore continuous quays built on the radial sandbanks at Nantong Port Lusi Ηarbor.The general layout plan of large dredged-in basin is put forward,which updates the traditional layout of offshore quays with wide marginal bank and long trestle.The above plan will develop local deep-water shoreline and beach resources effectively,promote harmonious development of port and port industries,and provide references for the port construction of Jiangsu-north-coast radial sandbanks.