Towards human performance measurement from the maintenance perspective: a review

With organisations adopting maintenance as a profit-generating business element, the role of maintenance in modern manufacturing industries is becoming even more important, clearly underscoring the importance of bringing maintenance operations in harmony with corporate business objectives. This area of study concerning the human aspect in over-all maintenance operations has received much emphasis recently. People in maintenance are not only limited in conducting diagnoses and error recovery, but also in planning and scheduling, recording data, handling and operating equipment, and training maintenance personnel. The performance of mission tasks manifests the abilities and limitations of humans involved in any system. Thus, since they are essential in systems operations, the effects of their performance on maintenance require a thorough study. This paper reviews current approaches for analysing, evaluating, and managing human performance in various industries focusing in the maintenance environment. Recommendation for future studies regarding a new approach to effectively evaluate the performance of maintenance personnel has been suggested.

[1]  Joel Levitt,et al.  The handbook of maintenance management , 1997 .

[2]  Faisal Khan,et al.  Determination of human error probabilities for offshore platform musters , 2005 .

[3]  Xiaojun Zhou,et al.  A dynamic opportunistic maintenance policy for continuously monitored systems , 2006 .

[4]  Sheue-Ling Hwang,et al.  Knowledge architecture and framework design for preventing human error in maintenance tasks , 2000 .

[5]  Anand K. Gramopadhye,et al.  Evaluation of Aircraft Maintenance Operations Using Process Measures , 2005 .

[6]  R. Schroeder,et al.  Relationships between implementation of TQM, JIT, and TPM and manufacturing performance , 2001 .

[7]  David J. Edwards,et al.  An artificial intelligence approach for improving plant operator maintenance proficiency , 2002 .

[8]  Alex Viale,et al.  Application of a human error framework to conduct train accident/incident investigations. , 2006, Accident; analysis and prevention.

[9]  David J. Edwards,et al.  Maintenance skills training of UK construction plant operatives: a pilot survey , 2002 .

[10]  M. Marseguerra,et al.  Quantitative developments in the cognitive reliability and error analysis method (CREAM) for the assessment of human performance , 2006 .

[11]  Barry Kirwan,et al.  Human reliability data requirements , 1995 .

[12]  U. Kumar Development and Implementation of Maintenance Performance Measurement System: Issues and Challenges , 2006 .

[13]  W. Oberkampf,et al.  Model validation and predictive capability for the thermal challenge problem , 2008 .

[14]  J. J. Higgins,et al.  Stochastic modelling of human-performance reliability , 1988 .

[15]  P. Jonsson,et al.  Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE , 1999 .

[16]  Balbir S. Dhillon,et al.  Human error in maintenance: a review , 2006 .

[17]  Ralph L. Keeney,et al.  On the uses of expert judgment on complex technical problems , 1989 .

[18]  Kazunari Morimoto,et al.  Human Performance Model and Evaluation of PBUI , 2007, HCI.

[19]  Ara Darzi,et al.  The surgical efficiency score: a feasible, reliable, and valid method of skills assessment. , 2006, American journal of surgery.

[20]  Mohamed Ben-Daya You may need RCM to enhance TPM implementation , 2000 .

[21]  J. Nicholas,et al.  Classifying plant operator maintenance proficiency: Examining personal variables , 2004 .

[22]  Andy Neely,et al.  Performance measurement system design , 1995 .

[23]  Imad Alsyouf,et al.  Measuring maintenance performance using a balanced scorecard approach : Methodology and Theory , 2006 .

[24]  Cheng‐Hua Wang,et al.  A stochastic maintenance management model with recovery factor , 2004 .

[25]  U. Sekaran,et al.  Research Methods for Business : A Skill Building Approach (5th Edition) , 1992 .

[26]  Uday Kumar,et al.  Maintenance performance measurement (MPM): issues and challenges , 2006 .

[27]  Paolo Trucco,et al.  A probabilistic cognitive simulator for HRA studies (PROCOS) , 2007, Reliab. Eng. Syst. Saf..

[28]  Bernhard Reer Review of advances in human reliability analysis of errors of commission - Part 2: EOC quantification , 2008, Reliab. Eng. Syst. Saf..

[29]  Aditya Parida,et al.  Study and analysis of maintenance performance indicators (MPIs) for LKAB: A case study , 2007 .

[30]  T.G. Ryan Human performance measurement: issues and challenges , 1988, Conference Record for 1988 IEEE Fourth Conference on Human Factors and Power Plants,.

[31]  Yung-Tsan Jou,et al.  A Review of Current Human Reliability Assessment Methods Utilized in High Hazard Human-System Interface Design , 2007, HCI.

[32]  Rajesh Aggarwal,et al.  Objective assessment of technical skills in cardiac surgery. , 2005, European journal of cardio-thoracic surgery : official journal of the European Association for Cardio-thoracic Surgery.

[33]  A. Darzi,et al.  Objective assessment of technical skills in surgery , 2003, BMJ : British Medical Journal.

[34]  Miroljub Grozdanovic,et al.  Framework for human error quantification , 2006 .

[35]  Prasad V. Prabhu,et al.  A review of human error in aviation maintenance and inspection , 2000 .

[36]  Wondea Jung,et al.  A taxonomy of performance influencing factors for human reliability analysis of emergency tasks , 2003 .

[37]  Terence Williams,et al.  HR performance evaluation quality management context: a review of the literature , 2004 .

[38]  Brian F. Gore,et al.  Modeling the complexities of human performance , 2005, 2005 IEEE International Conference on Systems, Man and Cybernetics.

[39]  A. Darzi,et al.  Objective assessment of technical skills of surgical trainees in Hong Kong , 2003, The British journal of surgery.

[40]  B. S. Dhillon Modeling human errors in repairable systems , 1989, Proceedings., Annual Reliability and Maintainability Symposium.

[41]  Seungwan Ryu,et al.  Human Performance Model for Combined Steering-Targeting Tasks , 2007, HCI.

[42]  J. R. Fragola,et al.  Human reliability analysis , 1988 .

[43]  Kari Laakso,et al.  A study on human errors related to NPP maintenance activities , 1997, Proceedings of the 1997 IEEE Sixth Conference on Human Factors and Power Plants, 1997. 'Global Perspectives of Human Factors in Power Generation'.

[44]  Kazuo Hatakeyama,et al.  Analysis of the fall of TPM in companies , 2006 .

[45]  Balbir S. Dhillon,et al.  Probabilistic analysis of a maintainable system with human error , 1995 .

[46]  Takashi Toriizuka,et al.  Application of performance shaping factor (PSF) for work improvement in industrial plant maintenance tasks , 2001 .

[47]  John A. Forester,et al.  Philosophy of ATHEANA , 1999 .

[48]  Umit Bititci,et al.  Strategy Management through Quantitative Modelling of Performance Measurement Systems , 2001 .

[49]  Faisal Khan,et al.  HEPI: A new tool for human error probability calculation for offshore operation , 2006 .

[50]  Lothar Pfitzner,et al.  From overall equipment efficiency (OEE) to overall Fab effectiveness (OFE) , 2002 .

[51]  Lindley R. Higgins,et al.  Maintenance Engineering Handbook , 1967 .

[52]  Joan Ryder,et al.  Validation and calibration of human performance models to support simulation-based acquisition , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..

[53]  S. M. Roberts,et al.  Scheduling of plant maintenance personnel , 1983 .

[54]  James J. Higgins,et al.  A literature survey of the human reliability component in a man-machine system , 1988 .

[55]  John A. Forester,et al.  Expert elicitation approach for performing ATHEANA quantification , 2004, Reliab. Eng. Syst. Saf..

[56]  Rajat Roy,et al.  Modelling and analysis of manufacturing systems: Ronald G. Askin and Charles R. Standridge John Wiley & Sons Chichester (1993) xvi + 461 pp £16.95 ISBN 0 471 57369 8 , 1994 .

[57]  Mahmoud M. Yasin,et al.  Performance measurement practices in manufacturing firms: an empirical investigation , 2006 .

[58]  Srinivas Kumar Pinjala,et al.  An empirical investigation on the relationship between business and maintenance strategies , 2006 .

[59]  Deepak Gaur Human factors analysis and classification system applied to civil aircraft accidents in India. , 2005, Aviation, space, and environmental medicine.

[60]  Yildiz Esra Albayrak,et al.  Using analytic hierarchy process (AHP) to improve human performance: An application of multiple criteria decision making problem , 2004, J. Intell. Manuf..

[61]  W. R. Nelson Integrated design environment for human performance and human reliability analysis , 1997, Proceedings of the 1997 IEEE Sixth Conference on Human Factors and Power Plants, 1997. 'Global Perspectives of Human Factors in Power Generation'.

[62]  A. J. Spurgin,et al.  Critique of current human reliability analysis methods , 2002, Proceedings of the IEEE 7th Conference on Human Factors and Power Plants.

[63]  Umit Bititci,et al.  Quantitative models for performance measurement system , 2000 .

[64]  Richard L. Henneman,et al.  Development and evaluation of a model of human performance in a large-scale system , 1988, IEEE Trans. Syst. Man Cybern..

[65]  T. Teyner,et al.  Maintenance scheduling and staffing policies in a wafer fabrication facility , 1998, ICMTS 1998.

[66]  Rory A. Cooper System identification of human performance models , 1991, IEEE Trans. Syst. Man Cybern..

[67]  Pia Oedewald,et al.  Core task modelling in cultural assessment: a case study in nuclear power plant maintenance , 2003, Cognition, Technology & Work.

[68]  Catherine Madden,et al.  Undergraduate nursing students' acquisition and retention of CPR knowledge and skills. , 2006, Nurse education today.