Scheduling for stability in single-machine production systems
暂无分享,去创建一个
[1] William G. Ferrell,et al. Dynamic rescheduling that simultaneously considers efficiency and stability , 2004, Comput. Ind. Eng..
[2] RICHARD L. DANIELS,et al. β-Robust scheduling for single-machine systems with uncertain processing times , 1997 .
[3] P. Fearnhead,et al. Exact filtering for partially observed continuous time models , 2004 .
[4] Panagiotis Kouvelis,et al. Robust scheduling to hedge against processing time uncertainty in single-stage production , 1995 .
[5] M. Selim Akturk,et al. Match-up scheduling under a machine breakdown , 1999, Eur. J. Oper. Res..
[6] Rajesh K. Gupta,et al. Faster maximum and minimum mean cycle algorithms for system-performance analysis , 1998, IEEE Trans. Comput. Aided Des. Integr. Circuits Syst..
[7] Velusamy Subramaniam,et al. Reactive Recovery of Job Shop Schedules – A Review , 2002 .
[8] Salah E. Elmaghraby,et al. On the fallacy of averages in project risk management , 2005, Eur. J. Oper. Res..
[9] Pei-Chann Chang,et al. One-machine rescheduling heuristics with efficiency and stability as criteria , 1993, Comput. Oper. Res..
[10] R. Britney. Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities , 1976 .
[11] Frederik Stork,et al. Stochastic resource-constrained project scheduling , 2001 .
[12] Willy Herroelen,et al. The construction of stable project baseline schedules , 2004, Eur. J. Oper. Res..
[13] Edward G. Coffman,et al. Scheduling independent tasks to reduce mean finishing time , 1974, CACM.
[14] Willy Herroelen,et al. The complexity of machine scheduling for stability with a single disrupted job , 2005, Oper. Res. Lett..
[15] John J. Kankt,et al. Manufacturing systems with forbidden early order departure , 1984 .
[16] Reha Uzsoy,et al. Predictable scheduling of a job shop subject to breakdowns , 1998, IEEE Trans. Robotics Autom..
[17] Roel Leus,et al. The generation of stable project plans , 2004, 4OR.
[18] G. Ding. Discrete optimization , 1977 .
[19] Richard F. Deckro,et al. Planning and re-planning in project and production scheduling☆ , 2002 .
[20] Reha Uzsoy,et al. Predictable scheduling of a single machine with breakdowns and sensitive jobs , 1999 .
[21] Panos Kouvelis,et al. Robust scheduling of a two-machine flow shop with uncertain processing times , 2000 .
[22] Reha Uzsoy,et al. Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..
[23] Javier Yáñez,et al. The robust coloring problem , 2003, Eur. J. Oper. Res..
[24] Richard M. Karp,et al. A characterization of the minimum cycle mean in a digraph , 1978, Discret. Math..
[25] John J. Kanet,et al. Manufacturing systems with forbidden early shipment: implications for choice of scheduling rules , 1990 .
[26] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[27] Alexander H. G. Rinnooy Kan,et al. Single machine flow-time scheduling with a single breakdown , 1989, Acta Informatica.
[28] Robert H. Storer,et al. Robustness Measures and Robust Scheduling for Job Shops , 1994 .
[29] V. Sridharan,et al. Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review , 2000, Oper. Res..
[30] A Gerodimos,et al. Robust Discrete Optimization and its Applications , 1996, J. Oper. Res. Soc..
[31] Candace Aria Yano,et al. Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs , 1987 .
[32] James C. Bean,et al. Matchup Scheduling with Multiple Resources, Release Dates and Disruptions , 1991, Oper. Res..