Fuzzy production systems: A state of the art literature review

[1]  Siba Sankar Mahapatra,et al.  Decision-making in selecting reverse logistics alternative using interval-valued fuzzy sets combined with VIKOR approach , 2013 .

[2]  Mohammad Hossein Fazel Zarandi,et al.  An enhanced NSGA-II algorithm for fuzzy bi-objective assembly line balancing problems , 2018, Comput. Ind. Eng..

[3]  I. Turksen Four methods of approximate reasoning with interval-valued fuzzy sets , 1989 .

[4]  Tien-Fu Liang,et al.  Application of fuzzy multi-objective linear programming to aggregate production planning , 2004, Comput. Ind. Eng..

[5]  Jerry M. Mendel,et al.  Design of Novel Interval Type-2 Fuzzy Controllers for Modular and Reconfigurable Robots: Theory and Experiments , 2011, IEEE Transactions on Industrial Electronics.

[6]  C. Pappis,et al.  A fuzzy-linguistic approach to a multi-criteria sequencing problem , 1996 .

[7]  Santosh Kumar Das,et al.  Intelligent energy-aware efficient routing for MANET , 2016, Wireless Networks.

[8]  Ivor Grattan-Guinness,et al.  Fuzzy Membership Mapped onto Intervals and Many-Valued Quantities , 1976, Math. Log. Q..

[9]  Krassimir T. Atanassov,et al.  Intuitionistic fuzzy sets , 1986 .

[10]  Parames Chutima,et al.  Two-sided assembly line car sequencing with a fuzzy adaptive extended coincidence algorithm , 2019 .

[11]  Francis J. Vasko,et al.  A practical solution to a fuzzy two-dimensional cutting stock problem , 1989 .

[12]  Shib Sankar Sana,et al.  A multi-periods production-inventory model with capacity constraints for multi-manufacturers - A global optimality in intuitionistic fuzzy environment , 2014, Appl. Math. Comput..

[13]  Bernard Grabot,et al.  A decision support system for variable routings management in manufacturing systems , 1993 .

[14]  K. Jahn Intervall‐wertige Mengen , 1975 .

[15]  R. Ghodsi,et al.  Real-time optimum sequencing of wood cutting process , 2005 .

[16]  Masatoshi Sakawa,et al.  Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..

[17]  Siba Sankar Mahapatra,et al.  Leanness estimation procedural hierarchy using interval-valued fuzzy sets (IVFS) , 2014 .

[18]  Waldemar Karwowski,et al.  Fuzzy concepts in production management research: a review , 1986 .

[19]  R. Yager ON THE THEORY OF BAGS , 1986 .

[20]  Javad Behnamian,et al.  Survey on fuzzy shop scheduling , 2016, Fuzzy Optim. Decis. Mak..

[21]  Nallan C. Suresh,et al.  Performance of Fuzzy ART neural network for group technology cell formation , 1994 .

[22]  Saurav Datta,et al.  Agility appraisement framework for integrated supply chain using generalised interval-valued fuzzy set , 2014, Int. J. Bus. Inf. Syst..

[23]  Jairo R. Montoya-Torres,et al.  Flow-shop scheduling problem under uncertainties: Review and trends , 2017 .

[24]  Zhi Pei,et al.  Rational decision making models with incomplete weight information for production line assessment , 2013, Inf. Sci..

[25]  Witold Pedrycz,et al.  Bi-level plant selection and production allocation model under type-2 fuzzy demand , 2017, Expert Syst. Appl..

[26]  Mehdi Ghazanfari,et al.  A hybrid simulated annealing based heuristic for solving the location-routing problem with fuzzy demands , 2013 .

[27]  Beyzanur Cayir Ervural,et al.  A Group Decision Making Approach for the Evaluation of Flexible Manufacturing Systems , 2016 .

[28]  Siba Sankar Mahapatra,et al.  Green supplier evaluation and selection using VIKOR method embedded in fuzzy expert system with interval-valued fuzzy numbers , 2012 .

[29]  Huey-Ming Lee,et al.  Fuzzy Nonlinear Programming for Production Inventory Based on Statistical Data , 2016, J. Adv. Comput. Intell. Intell. Informatics.

[30]  Juan Carlos Figueroa García,et al.  Multi-period Mixed Production Planning with uncertain demands: Fuzzy and interval fuzzy sets approach , 2012, Fuzzy Sets Syst..

[31]  Masoud Rabbani,et al.  Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach , 2008 .

[32]  Essam Shehab,et al.  Manufacturing cost modelling for concurrent product development , 2001 .

[33]  Cengiz Kahraman,et al.  Spherical fuzzy sets and spherical fuzzy TOPSIS method , 2019, J. Intell. Fuzzy Syst..

[34]  Bilal Toklu,et al.  Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models , 2009, Comput. Oper. Res..

[35]  Jonathan M. Garibaldi,et al.  Uncertain Fuzzy Reasoning: A Case Study in Modelling Expert Decision Making , 2007, IEEE Transactions on Fuzzy Systems.

[36]  Rakesh Nagi,et al.  Fuzzy set theory applications in production management research: a literature survey , 1998, J. Intell. Manuf..

[37]  H. Yao,et al.  An Interval-Valued Fuzzy Reasoning Approach Based on Weighted Similarity Measure , 2010 .

[38]  Gordan Stojić,et al.  A fuzzy linear programming model for aggregated production planning (APP) in the automotive industry , 2019, Comput. Ind..

[39]  Cengiz Kahraman,et al.  Multi-expert wind energy technology selection using interval-valued intuitionistic fuzzy sets , 2015 .

[40]  Lotfi A. Zadeh,et al.  The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .

[41]  Yuanping Xu Model for evaluating the mechanical product design quality with dual hesitant fuzzy information , 2016, J. Intell. Fuzzy Syst..

[42]  I. Turksen,et al.  An approximate analogical reasoning schema based on similarity measures and interval-valued fuzzy sets , 1990 .

[43]  Cengiz Kahraman,et al.  Multi-criteria evaluation of alternative-fuel vehicles via a hierarchical hesitant fuzzy linguistic model , 2015, Expert Syst. Appl..

[44]  Sanja Petrovic,et al.  Fuzzy job shop scheduling with lot-sizing , 2008, Ann. Oper. Res..

[45]  Cengiz Kahraman,et al.  Process capability analysis using intuitionistic fuzzy sets , 2017, J. Intell. Fuzzy Syst..

[46]  S. Susanto,et al.  A new fuzzy-c-means and assignment technique-based cell formation algorithm to perform part- type clusters and machine-type clusters separately , 1999 .

[47]  Cengiz Kahraman,et al.  Process Capability Analysis Using Interval Type-2 Fuzzy Sets , 2017, Int. J. Comput. Intell. Syst..

[48]  Jun Ling Zhang,et al.  Research on Multiple Attribute Decision Making under Hesitant Fuzzy Linguistic Environment with Application to Production Strategy Decision Making , 2013 .

[49]  Ravi Shankar,et al.  A goal programming model for joint decision making of inventory lot-size, supplier selection and carrier selection , 2014, Comput. Ind. Eng..

[50]  Tapan Kumar Roy,et al.  Intuitionistic fuzzy T-sets based optimization technique for production-distribution planning in supply chain management , 2016 .