Usando a avaliação independente de SQA como primeiro passo para transição de CMM para CMMI
暂无分享,去创建一个
The near deadline to make the transition to CMMI is a current concern for most of the Organizations at SW-CMM Level 2 or 3. These organisations have a powerful tool to help in this transition: the Software Quality Assurance Key Process Area (SQA KPA) and its required independent verification of the SQA. Having applied such verification in the Porto Alegre unit of HP R&D Brasil in a SCAMPI based appraisal Class B, we have made a proposal of a method for the identification of the gaps in relation to CMMI using the independent verification of CMM SQA KPA. Resumo. A aproximacao do prazo final para a transicao do SW-CMM para o CMMI, e uma preocupacao presente para muitas empresas com nivel 2 e 3 do CMM. Essas empresas possuem um instrumento poderoso para auxiliar nessa transicao: a propria area chave de processo de Garantia de Qualidade de Software (KPA SQA) e a exigencia de avaliacao independente da funcao Garantia da Qualidade de Software. A partir da realizacao dessa avaliacao na unidade de Porto Alegre da HP P&D Brasil, baseada no SCAMPI, em classe B, foi elaborada a proposta apresentada neste artigo, para um metodo de identificacao dos "gaps" em relacao ao CMMI pela realizacao dessa avaliacao independente.
[1] Mark C. Paulk,et al. The Capability Maturity Model: Guidelines for Improving the Software Process , 1994 .
[2] Gerard O’Regan,et al. The Capability Maturity Model , 2002 .