Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects
暂无分享,去创建一个
Jui-Sheng Chou | H. Ping Tserng | Chun-Pin Yeh | Jui-Sheng Chou | H. Tserng | Chieh Lin | Chieh Lin | Chun-Pin Yeh
[1] A. Akintoye,et al. Critical success factors for PPP/PFI projects in the UK construction industry , 2005 .
[2] Francesc Robusté,et al. Impact of High-Speed Lines in Relation to Very High Frequency Air Services , 2005 .
[3] Graham Capper,et al. Public Private Partnerships in the provision of health care premises in the UK , 2006 .
[4] Albert P.C. Chan,et al. Research Trend of Public-Private Partnership in Construction Journals , 2009 .
[5] Donna Harrington,et al. Confirmatory Factor Analysis , 2008 .
[6] Jingfeng Yuan,et al. The driving factors of china's public‐private partnership projects in Metropolitian transportation systems: Public sector's viewpoint , 2010 .
[7] Liang Y Liu,et al. An option pricing-based model for evaluating the financial viability of privatized infrastructure projects , 2002 .
[8] Hun-Koo Ha,et al. Analysis of the impact of high-speed railroad service on air transport demand , 2006 .
[9] Robert L. K. Tiong,et al. First Public-Private-Partnership Application in Taiwan’s Wastewater Treatment Sector: Case Study of the Nanzih BOT Wastewater Treatment Project , 2010 .
[10] George Zillante,et al. Critical success factors for BOT electric power projects in China: Thermal power versus wind power , 2010 .
[11] Patrick T.I. Lam,et al. Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region , 2009 .
[12] Maddi Garmendia,et al. The high-speed rail challenge for big intermediate cities: A national, regional and local perspective , 2009 .
[13] John T. Hodges,et al. Infrastructure Projects: A Review of Canceled Private Projects , 2003 .
[14] L. Hayduk. Structural equation modeling with LISREL , 1987 .
[15] R. Bagozzi,et al. On the evaluation of structural equation models , 1988 .
[16] Moshe Givoni,et al. Development and Impact of the Modern High‐speed Train: A Review , 2006 .
[17] Jonas Åkerman,et al. The role of high-speed rail in mitigating climate change : The Swedish case Europabanan from a life cycle perspective , 2011 .
[18] E. R. Yescombe,et al. Public-Private Partnerships: Principles of Policy and Finance , 2007 .
[19] Luh-Maan Chang,et al. BOT Financial Model: Taiwan High Speed Rail Case , 2001 .
[20] John A. Martilla,et al. Importance-Performance Analysis , 1977 .
[21] Alan D. Russell,et al. Project innovation - a function of procurement mode? , 2006 .
[22] Wynne W. Chin. Issues and Opinion on Structural Equation Modeling by , 2009 .
[23] Rex B. Kline,et al. Principles and Practice of Structural Equation Modeling , 1998 .
[24] Xueqing Zhang,et al. Critical Success Factors for Public-Private Partnerships in Infrastructure Development , 2005 .
[25] Xueqing Zhang,et al. Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects , 2005 .
[26] Near-bankruptcy of the Taiwan High Speed Rail Corporation: what went wrong? , 2010 .
[27] Changwan Kim,et al. Deploying effective service strategy in the operations stage of high-speed rail , 2011 .
[28] Yung-Cheng Lai,et al. Privatization versus Public Works for High-Speed Rail Projects , 2010 .
[29] Brenda Chang,et al. Life cycle greenhouse gas assessment of infrastructure construction for California’s high-speed rail system , 2011 .
[30] M. Lewis,et al. Evaluating the risks of public private partnerships for infrastructure projects , 2002 .
[31] J. A. E. Silva,et al. The Portuguese High Speed Rail Network; Relating Financing to Strategic and Operating Issues , 2011 .
[32] Hui-Ping Tserng,et al. Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project , 2006 .
[33] Oliver F. Shyr,et al. Does high-speed rail accessibility influence residential property prices? Hedonic estimates from southern Taiwan , 2010 .
[34] W. Deng. Fuzzy importance‐performance analysis for determining critical service attributes , 2008 .
[35] Patrick T.I. Lam,et al. Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .
[36] Sy-Jye Guo,et al. Owner-Controlled Insurance Program and Construction Project Management for Taiwan High Speed Rail Project , 2010 .
[37] Timothy C. Irwin. Government Guarantees: Allocating and Valuing Risk in Privately Financed Infrastructure Projects , 2007 .
[38] Cledan Mandri-Perrott,et al. Private Sector Participation in Light Rail-Light Metro Transit Initiatives , 2010 .
[39] Jeffrey S. Russell,et al. Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study , 2012 .
[40] Sophie Masson,et al. Can the high speed rail reinforce tourism attractiveness? The case of the high speed rail between Perpignan (France) and Barcelona (Spain) , 2009 .
[41] Albert L. Lederer,et al. Decision support systems unfrastructure: The root problems of the management of changing IT , 2008, Decis. Support Syst..
[42] Yung-Hsiang Cheng. High-speed rail in Taiwan: New experience and issues for future development , 2010 .
[43] Q. Shen,et al. A review of studies on Public–Private Partnership projects in the construction industry , 2010 .
[44] Javier Campos,et al. A review of HSR experiences around the world , 2007 .
[45] Robert van den Brink,et al. ENVIRONMENTAL IMPACTS OF HIGH-SPEED RAIL LINKS IN COST-BENEFIT ANALYSES: A CASE STUDY OF THE DUTCH ZUIDER ZEE LINE , 2003 .