Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects

This study compared the use of public–private partnership (PPP) policy between high speed rail (HSR) projects and general infrastructure projects. Based on extensive literature reviews, drivers for adopting PPP strategy, critical success factors, and preferred risk factor allocation were collected to design a structural questionnaire for professionals in Taiwan and to elicit their PPP project experience. Analytical findings reveal that most experience learnt from general infrastructure projects is applicable in HSR projects after proper modification. This study provides a valuable reference for stakeholders interested in executing HSR via PPP.

[1]  A. Akintoye,et al.  Critical success factors for PPP/PFI projects in the UK construction industry , 2005 .

[2]  Francesc Robusté,et al.  Impact of High-Speed Lines in Relation to Very High Frequency Air Services , 2005 .

[3]  Graham Capper,et al.  Public Private Partnerships in the provision of health care premises in the UK , 2006 .

[4]  Albert P.C. Chan,et al.  Research Trend of Public-Private Partnership in Construction Journals , 2009 .

[5]  Donna Harrington,et al.  Confirmatory Factor Analysis , 2008 .

[6]  Jingfeng Yuan,et al.  The driving factors of china's public‐private partnership projects in Metropolitian transportation systems: Public sector's viewpoint , 2010 .

[7]  Liang Y Liu,et al.  An option pricing-based model for evaluating the financial viability of privatized infrastructure projects , 2002 .

[8]  Hun-Koo Ha,et al.  Analysis of the impact of high-speed railroad service on air transport demand , 2006 .

[9]  Robert L. K. Tiong,et al.  First Public-Private-Partnership Application in Taiwan’s Wastewater Treatment Sector: Case Study of the Nanzih BOT Wastewater Treatment Project , 2010 .

[10]  George Zillante,et al.  Critical success factors for BOT electric power projects in China: Thermal power versus wind power , 2010 .

[11]  Patrick T.I. Lam,et al.  Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region , 2009 .

[12]  Maddi Garmendia,et al.  The high-speed rail challenge for big intermediate cities: A national, regional and local perspective , 2009 .

[13]  John T. Hodges,et al.  Infrastructure Projects: A Review of Canceled Private Projects , 2003 .

[14]  L. Hayduk Structural equation modeling with LISREL , 1987 .

[15]  R. Bagozzi,et al.  On the evaluation of structural equation models , 1988 .

[16]  Moshe Givoni,et al.  Development and Impact of the Modern High‐speed Train: A Review , 2006 .

[17]  Jonas Åkerman,et al.  The role of high-speed rail in mitigating climate change : The Swedish case Europabanan from a life cycle perspective , 2011 .

[18]  E. R. Yescombe,et al.  Public-Private Partnerships: Principles of Policy and Finance , 2007 .

[19]  Luh-Maan Chang,et al.  BOT Financial Model: Taiwan High Speed Rail Case , 2001 .

[20]  John A. Martilla,et al.  Importance-Performance Analysis , 1977 .

[21]  Alan D. Russell,et al.  Project innovation - a function of procurement mode? , 2006 .

[22]  Wynne W. Chin Issues and Opinion on Structural Equation Modeling by , 2009 .

[23]  Rex B. Kline,et al.  Principles and Practice of Structural Equation Modeling , 1998 .

[24]  Xueqing Zhang,et al.  Critical Success Factors for Public-Private Partnerships in Infrastructure Development , 2005 .

[25]  Xueqing Zhang,et al.  Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects , 2005 .

[26]  Near-bankruptcy of the Taiwan High Speed Rail Corporation: what went wrong? , 2010 .

[27]  Changwan Kim,et al.  Deploying effective service strategy in the operations stage of high-speed rail , 2011 .

[28]  Yung-Cheng Lai,et al.  Privatization versus Public Works for High-Speed Rail Projects , 2010 .

[29]  Brenda Chang,et al.  Life cycle greenhouse gas assessment of infrastructure construction for California’s high-speed rail system , 2011 .

[30]  M. Lewis,et al.  Evaluating the risks of public private partnerships for infrastructure projects , 2002 .

[31]  J. A. E. Silva,et al.  The Portuguese High Speed Rail Network; Relating Financing to Strategic and Operating Issues , 2011 .

[32]  Hui-Ping Tserng,et al.  Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project , 2006 .

[33]  Oliver F. Shyr,et al.  Does high-speed rail accessibility influence residential property prices? Hedonic estimates from southern Taiwan , 2010 .

[34]  W. Deng Fuzzy importance‐performance analysis for determining critical service attributes , 2008 .

[35]  Patrick T.I. Lam,et al.  Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .

[36]  Sy-Jye Guo,et al.  Owner-Controlled Insurance Program and Construction Project Management for Taiwan High Speed Rail Project , 2010 .

[37]  Timothy C. Irwin Government Guarantees: Allocating and Valuing Risk in Privately Financed Infrastructure Projects , 2007 .

[38]  Cledan Mandri-Perrott,et al.  Private Sector Participation in Light Rail-Light Metro Transit Initiatives , 2010 .

[39]  Jeffrey S. Russell,et al.  Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study , 2012 .

[40]  Sophie Masson,et al.  Can the high speed rail reinforce tourism attractiveness? The case of the high speed rail between Perpignan (France) and Barcelona (Spain) , 2009 .

[41]  Albert L. Lederer,et al.  Decision support systems unfrastructure: The root problems of the management of changing IT , 2008, Decis. Support Syst..

[42]  Yung-Hsiang Cheng High-speed rail in Taiwan: New experience and issues for future development , 2010 .

[43]  Q. Shen,et al.  A review of studies on Public–Private Partnership projects in the construction industry , 2010 .

[44]  Javier Campos,et al.  A review of HSR experiences around the world , 2007 .

[45]  Robert van den Brink,et al.  ENVIRONMENTAL IMPACTS OF HIGH-SPEED RAIL LINKS IN COST-BENEFIT ANALYSES: A CASE STUDY OF THE DUTCH ZUIDER ZEE LINE , 2003 .