Optimized Adjustment Tests on Pulverized Coal Preparation System and Burning at Yongcheng Power Plant

This article introduces the optimized adjustment tests on pulverized coal preparation system and burning at Yongcheng power plant.The results indicate that the units can long time operate stably.The main parameter of the boiler reaches the design requirement.The efficiency of the boiler exceeds the guaranteed value.