An intelligent approach for the evaluation of innovation projects
暂无分享,去创建一个
[1] Lotfi A. Zadeh,et al. Fuzzy logic, neural networks, and soft computing , 1993, CACM.
[2] Dejian Yu,et al. Triangular Hesitant Fuzzy Set and Its Application to Teaching Quality Evaluation , 2013 .
[3] J. Mikkola. Portfolio management of R&D projects: implications for innovation management , 2001 .
[4] Cengiz Kahraman,et al. Hesitant fuzzy analytic hierarchy process , 2015, 2015 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE).
[5] Gwo-Hshiung Tzeng,et al. Multicriteria Planning of Post‐Earthquake Sustainable Reconstruction , 2002 .
[6] Deng Yong. Plant location selection based on fuzzy TOPSIS , 2006 .
[7] Pablo Aragonés Beltrán,et al. An AHP-based evaluation procedure for Innovative Educational Projects : A face-to-face vs. computer-mediated case study , 2008 .
[8] Cheng-Wei Lin,et al. Multi-criteria analysis of alternative-fuel buses for public transportation , 2005 .
[9] Adriana Bin,et al. R&D and Innovation Project Selection: Can Optimization Methods be Adequate? , 2015, ITQM.
[10] Francisco Herrera,et al. Hesitant Fuzzy Linguistic Term Sets for Decision Making , 2012, IEEE Transactions on Fuzzy Systems.
[11] Gwo-Hshiung Tzeng,et al. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..
[12] Hongbin Liu,et al. A fuzzy envelope for hesitant fuzzy linguistic term set and its application to multicriteria decision making , 2014, Inf. Sci..
[13] Ahmet Beskese,et al. CNC router selection for SMEs in woodwork manufacturing using hesitant fuzzy AHP method , 2018, J. Enterp. Inf. Manag..
[14] Ahmet Beskese,et al. Sustainability analysis of different hydrogen production options using hesitant fuzzy AHP , 2018, International Journal of Hydrogen Energy.
[15] Tien-Hsiang Chang,et al. Analysis of the CSFs affecting project execution: a case application , 2018 .
[16] Funda Samanlioglu,et al. A Fuzzy AHP–TOPSIS-Based Group Decision-Making Approach to IT Personnel Selection , 2018, International Journal of Fuzzy Systems.
[17] M. Gul,et al. A comparative outline for quantifying risk ratings in occupational health and safety risk assessment , 2018, Journal of Cleaner Production.
[18] Richard P. Vlosky,et al. Management Activity Linkages to Innovation Deconstruction: An Exploratory Study of the Furniture Industry in Croatia , 2016 .
[19] Zeshui Xu,et al. Pythagorean fuzzy VIKOR approaches based on TODIM for evaluating internet banking website quality of Ghanaian banking industry , 2019, Appl. Soft Comput..
[20] Vicenç Torra,et al. On hesitant fuzzy sets and decision , 2009, 2009 IEEE International Conference on Fuzzy Systems.
[21] Gwo-Hshiung Tzeng,et al. Extended VIKOR method in comparison with outranking methods , 2007, Eur. J. Oper. Res..
[22] Jacques W. Brook,et al. Integrating sustainability into innovation project portfolio management - A strategic perspective , 2014 .
[23] Fatih Tüysüz,et al. A hesitant fuzzy linguistic term sets-based AHP approach for analyzing the performance evaluation factors: an application to cargo sector , 2017 .
[24] Jin Wang,et al. Research on project selection system of pre-evaluation of engineering design project bidding , 2009 .
[25] Prasanta Kumar Dey,et al. Integrated project evaluation and selection using multiple-attribute decision-making technique , 2006 .
[26] Shu-Ping Wan,et al. Extended VIKOR method for multiple criteria decision-making with linguistic hesitant fuzzy information , 2017, Comput. Ind. Eng..
[27] Martin Lerch,et al. Innovation Project Portfolio Management: A Qualitative Analysis , 2013, IEEE Transactions on Engineering Management.
[28] Gwo-Hshiung Tzeng,et al. Fuzzy Multicriteria Model for Postearthquake Land-Use Planning , 2003 .
[29] Patrick Spieth,et al. Augmenting Innovation Project Portfolio Management Performance: The Mediating Effect of Management Perception and Satisfaction , 2014 .
[30] Theodor J. Stewart,et al. Integrated object-oriented framework for MCDM and DSS modelling , 2004, Decis. Support Syst..
[31] A. K. Meifort. Innovation Portfolio Management: A Synthesis and Research Agenda , 2016 .
[32] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[33] Kexin Li,et al. Selecting sustainable energy conversion technologies for agricultural residues: A fuzzy AHP-VIKOR based prioritization from life cycle perspective , 2019, Resources, Conservation and Recycling.
[34] Zeki Ayağ,et al. A fuzzy AHP-based simulation approach to concept evaluation in a NPD environment , 2005 .
[35] Funda Samanlioglu,et al. A fuzzy AHP-PROMETHEE II approach for evaluation of solar power plant location alternatives in Turkey , 2017, J. Intell. Fuzzy Syst..
[36] Gwo-Hshiung Tzeng,et al. Multicriteria selection for a restaurant location in Taipei , 2002 .
[37] L. Suganthi,et al. Multi expert and multi criteria evaluation of sectoral investments for sustainable development: An integrated fuzzy AHP, VIKOR / DEA methodology , 2018, Sustainable Cities and Society.
[38] Rifat Gürcan Özdemir,et al. A Fuzzy AHP Approach to Evaluating Machine Tool Alternatives , 2006, J. Intell. Manuf..
[39] Masood A. Badri,et al. A comprehensive 0-1 goal programming model for project selection , 2001 .
[40] Jamil Ahmad,et al. A group decision making framework based on fuzzy VIKOR approach for machine tool selection with linguistic information , 2016, Appl. Soft Comput..
[41] Zeshui Xu,et al. Multi-attribute decision making methods based on reference ideal theory with probabilistic hesitant information , 2019, Expert Syst. Appl..
[42] R. Rakkiyappan,et al. Interval-valued intuitionistic hesitant fuzzy entropy based VIKOR method for industrial robots selection , 2019, Expert Syst. Appl..
[43] L. Anojkumar,et al. Comparative analysis of MCDM methods for pipe material selection in sugar industry , 2014, Expert Syst. Appl..
[44] F. Lootsma. Fuzzy Logic for Planning and Decision Making , 1997 .
[45] Jun Dong,et al. Competition ability evaluation of power generation enterprises using a hybrid MCDM method under fuzzy and hesitant linguistic environment , 2018, Journal of Renewable and Sustainable Energy.
[46] Ayfer Başar,et al. Hesitant fuzzy pairwise comparison for software cost estimation: a case study in Turkey , 2017, Turkish J. Electr. Eng. Comput. Sci..
[47] Serafim Opricovic,et al. Fuzzy VIKOR with an application to water resources planning , 2011, Expert Syst. Appl..
[48] Cengiz Kahraman,et al. Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul , 2010 .
[49] Dimitar Filev,et al. On the issue of obtaining OWA operator weights , 1998, Fuzzy Sets Syst..