A LOGISTICS FRAMEWORK FOR IMPROVING CONSTRUCTION SUPPLY CHAIN PERFORMANCE

In recent years, attention has been placed on the logistics activities in construction projects in order to reduce total costs. The construction industry is experiencing poor productivity, resulting from an inability of contractors, subcontractors, and suppliers to cooperate efficiently. Research on logistics in construction lacks a holistic perspective and tends to focus on one activity at a time. This research presents the Builder’s SCOR model (BSCOR) to be used for logistics improvements in construction. The model is based on the Supply Chain Operations Reference Model (SCOR model) covering the total supply chain. The BSCOR model is empirically derived through five case studies at different construction sites over a period of five years. This has resulted in a model covering the activities Source, Build, and Plan, that describes the flow of materials to and on the site and how ownership passes to the client. With the BSCOR model, contractors can map the material and information flows between supply chain members with standardized process definitions. It is also possible to precisely measure the supply chain performance and to know where to put improvements efforts. The main intention with the BSCOR model is to help the industry reduce costs and increase productivity.

[1]  A. Fearne,et al.  Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .

[2]  Kassim Gidado ENHANCING THE PRIME CONTRACTOR'S PRE-CONSTRUCTION PLANNING , 2004 .

[3]  Robert Rosenbaum,et al.  Supply chain excellence : a handbook for dramatic improvement using the SCOR model , 2007 .

[4]  Brian Wilson,et al.  Investigating first planning in construction , 2006 .

[5]  Fredrik Persson,et al.  Adapting the SCOR model to the construction industry settings , 2012 .

[6]  Tutu Wegelius-Lehtonen,et al.  Performance measurement in construction logistics , 2001 .

[7]  Alain Guinet,et al.  A Porter-SCOR modelling approach for the hospital supply chain , 2009 .

[8]  Scott Fernie,et al.  Exploring change in construction: supply chain management , 2007 .

[9]  Xxi Ciclo,et al.  CONTROLLING AND IMPROVING THE PROVISION OF AFTER-SALES SERVICES , 2011 .

[10]  Tetsuo Tomiyama,et al.  Advanced Engineering Informatics , 2007, Adv. Eng. Informatics.

[11]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[12]  Fredrik Persson,et al.  Towardsa SCOR-Based Analysis Tool for Construction Management and Logistics , 2011 .

[13]  Hans Voordijk,et al.  Physical distribution costs in construction supply chains: a systems approach , 2010 .

[14]  Fredrik Persson,et al.  Coordinated supply chain planning in construction , 2013 .

[15]  Andrew R.J. Dainty,et al.  Subcontractor perspectives on supply chain alliances , 2001 .

[16]  Hans-Joachim Bargstädt,et al.  Construction logistics planning by simulation , 2010, Proceedings of the 2010 Winter Simulation Conference.

[17]  Albert T. Jones,et al.  Modeling and monitoring of construction supply chains , 2010, Adv. Eng. Informatics.

[18]  Andrew D.F. Price,et al.  Building a conceptual framework for measuring business performance in construction: an empirical evaluation , 2005 .

[19]  John Tookey,et al.  The logistics of construction supply chains: the builders' merchant perspective , 2011 .

[20]  Richard L. Tucker,et al.  Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .