Reaction chain of process queue time quality control
暂无分享,去创建一个
Yih-Yi Lee | C. Wu | C.T. Chen
[1] Jennifer K. Robinson,et al. Capacity planning for semiconductor wafer fabrication with time constraints between operations , 1999, WSC '99.
[2] David D. Yao,et al. A queueing network model for semiconductor manufacturing , 1996 .
[3] Jonathan F. Bard,et al. The use of upstream and downstream information in scheduling semiconductor batch operations , 1995 .
[4] H. Toba. Segment-based approach for real-time reactive rescheduling for automatic manufacturing control , 2000 .