Forecast of Applied Effect for Truck Real-Time Dispatch System in Open-Pit Mine Based on CSUSS

In order to solve the problem of that the initial investment of truck dispatching system is vast and how to quantify scientifically to analyze the technical factor of truck dispatching system. A truck real-time dispatching model was built based on two minimization dispatch criterion. The method of "Comparing different index setting Simulations Used by the Same Shift(CSUSS)" was put forward. Regard transportation sub-system of a large open-pit mine as the application instance, the application effect scientific forecast of truck dispatching system for the large open-pit mine is realized. It is demonstrated by practice that this new method has a highly applied value. And so as to provide technical references for the managers of the open-pit mine to be used truck dispatching system.