Analysis of postponement strategy by EPQ-based models with planned backorders
暂无分享,去创建一个
[1] Gino K. Yang,et al. Technical note: The EOQ and EPQ models with shortages derived without derivatives , 2004 .
[2] Wei Wang,et al. Commonality and postponement in multistage assembly systems , 2002, Eur. J. Oper. Res..
[3] S. Goyal. Determination of Optimum Packaging Frequency of Items Jointly Replenished , 1974 .
[4] Hau L. Lee,et al. Managing Product Variety: An Operations Perspective , 1999 .
[5] Frank T. Shu. Economic Ordering Frequency for two Items Jointly Replenished , 1971 .
[6] Mark Ferguson,et al. Evaluation of postponement structures to accommodate mass customization , 2005 .
[7] Bhanu S. Ragu-Nathan,et al. The impact of supply chain management practices on competitive advantage and organizational performance , 2006 .
[8] Moncer Hariga,et al. Comparative study of heuristics for the joint replenishment problem , 1995 .
[9] Awi Federgruen,et al. Capacitated Multi-Item Inventory Systems with Random and Seasonally Fluctuating Demands: Implications for Postponement Strategies , 2001, Manag. Sci..
[10] M. Christopher. The Agile Supply Chain : Competing in Volatile Markets , 2000 .
[11] Samuel Eilon,et al. Multi-product batch production on a single machine--A problem revisited , 1985 .
[12] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[13] Ricardo Ernst,et al. Evaluation of supply chain structures through modularization and postponement , 2000, Eur. J. Oper. Res..
[14] Suresh Kumar Goyal. Determination of economic production quantities for a two-product single machine system , 1984 .
[15] Hau L. Lee,et al. Effective Inventory and Service Management Through Product and Process Redesign , 1996, Oper. Res..
[16] Michael J. Magazine,et al. Quantitative Models for Supply Chain Management , 1998 .
[17] Suresh Kumar Goyal,et al. Joint replenishment inventory control: Deterministic and stochastic models , 1989 .
[18] D. Nocturne. Note--Economic Ordering Frequency for Several Items Jointly Replenished , 1973 .
[19] Christopher S. Tang,et al. Modelling the Costs and Benefits of Delayed Product Differentiation , 1997 .
[20] Hau L. Lee,et al. Xilinx Improves Its Semiconductor Supply Chain Using Product and Process Postponement , 2000, Interfaces.
[21] R. V. Hoek,et al. The rediscovery of postponement a literature review and directions for research , 2001 .
[22] Leopoldo Eduardo Cárdenas-Barrón,et al. The economic production quantity (EPQ) with shortage derived algebraically , 2001 .
[23] Christopher S. Tang,et al. On postponement strategies for product families with multiple points of differentiation , 1997 .
[24] Wroe Alderson,et al. Marketing efficiency and the principle of Postponement , 2006 .
[25] E. Silver. A Simple Method of Determining Order Quantities in Joint Replenishments Under Deterministic Demand , 1976 .