Takt Time Planning for Construction of Exterior Cladding
暂无分享,去创建一个
[1] Glenn Ballard,et al. Cycle Time Reduction in Home Building , 2001 .
[2] Guillermo J. Velarde,et al. Process flow improvement proposal using lean manufacturing philosophy and simulation techniques on a modular home manufacturer , 2009 .
[3] J. O'Toole,et al. Shop floor control , 1974, AFIPS '74.
[4] Olli Seppänen,et al. A Case Study of Line-of-Balance based Schedule Planning and Control System , 2005 .
[5] Thais da C. L. Alves,et al. Using the Line of Balance for Production System Design , 2008 .
[6] Greg Howell,et al. Using Production System Design and Takt Time To Improve Project Performance , 2012 .
[7] Mohamed Al-Hussein,et al. Development of Lean Model for House Construction Using Value Stream Mapping , 2009 .
[8] Iamara Rossi Bulhões,et al. Actions to Implement Continuous Flow in the Assembly of Pre-Fabricated Concrete Structure , 2006 .
[9] Anil Sawhney,et al. Implications of Even Flow Production Methodology for U.S. Housing Industry , 2003 .
[10] Steven A. Melnyk,et al. Shop Floor Control , 1985 .
[11] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[12] Jeffrey K. Liker,et al. The Toyota way fieldbook : a practical guide for implementing Toyota's 4Ps , 2004 .
[13] Klas Berghede,et al. An Experiment in Takt Time Planning Applied to Non-Repetitive Work , 2013 .