Performance management in manufacturing : a method for short term performance evaluation and diagnosis

• A submitted manuscript is the version of the article upon submission and before peer-review. There can be important differences between the submitted version and the official published version of record. People interested in the research are advised to contact the author for the final version of the publication, or visit the DOI to the publisher's website. • The final author version and the galley proof are versions of the publication after peer review. • The final published version features the final layout of the paper including the volume, issue and page numbers.

[1]  Milan Moravec The Performance Evaluation , 1983 .

[2]  Ludo Gelders SHOP FLOOR PERFORMANCE INDICATORS , 1990 .

[3]  Salah E. Elmaghraby Manufacturing capacity and its measurement: A critical evaluation , 1991, Comput. Oper. Res..

[4]  S.D.P. Flapper,et al.  Towards consistent performance management systems , 1996 .

[5]  John R. Anderson Cognitive Psychology and Its Implications , 1980 .

[6]  Leonard L Fortuin,et al.  Performance Indicators — Why, Where and How? , 1988 .

[7]  Herbert A. Simon,et al.  The new science of management decision , 1960 .

[8]  Caroline Wagner,et al.  Problem solving and diagnosis , 1993 .

[9]  Feng-Chang R. Chang A study of factors affecting due-date predictability in a simulated dynamic job shop , 1994 .

[10]  Lessey Sooklal,et al.  Measurement for Management Decision , 1982 .

[11]  Ranga V. Ramasesh Dynamic job shop scheduling: A survey of simulation research , 1990 .

[12]  Gerald F. Smith Defining Managerial Problems: A Framework for Prescriptive Theorizing , 1989 .

[13]  H. Simon,et al.  Administrative Behavior: A Study of Decision-Making Processes in Administrative Organization. , 1959 .

[14]  Lesley Davis An Introduction to Operations Management , 1992 .

[15]  S. M. Wu,et al.  A Time Series Approach to Queueing Systems with Applications for Modeling Job-Shop In-Process Inventories , 1977 .

[16]  Steven D. Jones,et al.  Effects of group feedback, goal setting, and incentives on organizational productivity. , 1988 .

[17]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[18]  Achilles A. Armenakis,et al.  Diagnostic bias in organizational consultation , 1990 .

[19]  Jon Frye Labor Flexibility in Multiechelon Dual-Constraint Job Shops , 1974 .

[20]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[21]  劉清明,et al.  [評Robin cooper etc.,Implementing Activity-based Cost Management: Moving from Analysis to Action]作業制成本管理之實施(上) , 1993 .

[22]  G. K. Kenny,et al.  The utility of performance measures: production manager's perceptions , 1989 .

[23]  Shlomo Globerson,et al.  Issues in developing a performance criteria system for an organization , 1985 .

[24]  Bengt Karlöf,et al.  Benchmarking: A Signpost to Excellence in Quality and Productivity , 1994 .

[25]  T. Kumpe,et al.  Manufacturing in the 1990s - productivity, flexibility and innovation , 1990 .

[26]  Bruce W. Schmeiser,et al.  Batch Size Effects in the Analysis of Simulation Output , 1982, Oper. Res..

[27]  A. Meyer,et al.  Lasting Improvements in Manufacturing Performance: In Search of a New Theory , 1990 .

[28]  Stewart Robinson,et al.  Simulation: A Statistical Perspective , 1993 .

[29]  W. Whitt,et al.  The Queueing Network Analyzer , 1983, The Bell System Technical Journal.

[30]  W. M. Bernstein,et al.  Stream Analysis: a Powerful Way to Diagnose and Manage Organizational Change , 1987 .

[31]  Chauncey A. Goodrich,et al.  Webster's dictionary of the English language , 1876 .

[32]  Vcs Vincent Wiers,et al.  What is really happening at the shop floor, and why do scheduling techniques not work? , 1995 .

[33]  Godwin J. Udo,et al.  A Simulation Study of Due-date Assignment Rules in a Dynamic Job Shop , 1994 .

[34]  John S. Edwards An Introduction to Operations Management , 1992 .

[35]  Yiannis Gabriel,et al.  Logistics of Production and Inventory , 1993, Handbooks in Operations Research and Management Science.

[36]  Marinus J. Bouwman Human Diagnostic Reasoning by Computer: An Illustration from Financial Analysis , 1983 .

[37]  Stephen S. Lavenberg,et al.  Mean-Value Analysis of Closed Multichain Queuing Networks , 1980, JACM.

[38]  Jwm Will Bertrand,et al.  Production Control: A Structural and Design Oriented Approach , 1990 .

[39]  M. H. Corbey Logistiek Management & Management Accounting , 1997 .

[40]  S. Subba Rao,et al.  The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis , 1992 .

[41]  Shlomo Globerson,et al.  Multi-performance measures for better operational control , 1989 .

[42]  R. Kaplan Measuring manufacturing performance: a new challenge for managerial accounting research , 1983 .

[43]  Hans-Peter Wiendahl,et al.  Monitoring and diagnosis systems: New components of production planning and control — methodologies, applications and experience , 1994 .