The Optimal Strategy of Using BIM in Construction Management
暂无分享,去创建一个
[1] L. Trigeorgis. The Nature of Option Interactions and the Valuation of Investments with Multiple Real Options , 1993, Journal of Financial and Quantitative Analysis.
[2] A. Vollert. A Stochastic Control Framework for Real Options in Strategic Evaluation , 2002 .
[3] Weisheng Lu,et al. Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks , 2013 .
[4] W. Strange,et al. The timing and intensity of investment , 1999 .
[5] Tuomas Laine,et al. Benefits of Building Information Models in Energy Analysis , 2007 .
[6] Rafael Sacks,et al. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .
[7] Eduardo S. Schwartz,et al. Investment Under Uncertainty. , 1994 .
[8] Rob Howard,et al. Building information modelling - Experts' views on standardisation and industry deployment , 2008, Adv. Eng. Informatics.
[9] Ghang Lee,et al. A Target Benchmark of the Impact of Three-Dimensional Parametric Modeling in Precast Construction , 2005 .
[10] B. Øksendal. Stochastic differential equations : an introduction with applications , 1987 .
[11] Rafael Sacks,et al. Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms , 2008, J. Inf. Technol. Constr..