Scheduling automated triple cross-over stacking cranes in a container yard
暂无分享,去创建一个
[1] Y. A. Saanen,et al. An approach for designing robotized marine container terminals , 2004 .
[2] Kwang Ryel Ryu,et al. Real-Time Scheduling for Non-crossing Stacking Cranes in an Automated Container Terminal , 2007, Australian Conference on Artificial Intelligence.
[3] W. C. Ng,et al. Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..
[4] Yvo Saanen,et al. Which system fits your hub , 2007 .
[5] Thorsten Koch,et al. Optimizing the landside operation of a container terminal , 2008, OR Spectr..
[6] Peter Bohrer,et al. Crane Scheduling in Container Terminals , 2010 .
[7] Carlos F. Daganzo,et al. THE CRANE SCHEDULING PROBLEM , 1989 .
[8] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[9] Thorsten Koch,et al. Rapid mathematical programming , 2005 .
[10] Ioannis Zyngiridis. Optimizing container movements using one and two automated stacking cranes , 2009 .
[11] K. L. Mak,et al. Yard crane scheduling in port container terminals , 2005 .
[12] Udatta S. Palekar,et al. Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations , 2002, Transp. Sci..
[13] Robert Stahlbock,et al. Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals , 2010 .
[14] Yvo A. Saanen,et al. Comparison of three automated stacking alternatives by means of simulation , 2005, Proceedings of the Winter Simulation Conference, 2005..
[15] Kap Hwan Kim,et al. An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals , 1999, Transp. Sci..