Scheduling automated triple cross-over stacking cranes in a container yard

We describe an approach for scheduling triple cross-over stacking cranes in an automated container storage block with asynchronous hand over at the transfer areas at both block front ends. The problem is characterised by frequent long crane moves that make job assignment and crane routing particularly challenging, as an intricate synchronisation between the cranes is required. The main objective is to maximise the productivity of the crane system under peak load while preventing delays in the transport of import and export containers from and to the transfer areas. Our method solves an online optimisation problem by constructing a new crane schedule for a certain planning horizon whenever a new job arrives or a job is completed. We report on extensive simulation studies for evaluating the scheduling strategy. The results show that the method performs significantly better than commonly used heuristics, leading to a productivity gain of more than 20%.

[1]  Y. A. Saanen,et al.  An approach for designing robotized marine container terminals , 2004 .

[2]  Kwang Ryel Ryu,et al.  Real-Time Scheduling for Non-crossing Stacking Cranes in an Automated Container Terminal , 2007, Australian Conference on Artificial Intelligence.

[3]  W. C. Ng,et al.  Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..

[4]  Yvo Saanen,et al.  Which system fits your hub , 2007 .

[5]  Thorsten Koch,et al.  Optimizing the landside operation of a container terminal , 2008, OR Spectr..

[6]  Peter Bohrer,et al.  Crane Scheduling in Container Terminals , 2010 .

[7]  Carlos F. Daganzo,et al.  THE CRANE SCHEDULING PROBLEM , 1989 .

[8]  Stefan Voß,et al.  Operations research at container terminals: a literature update , 2007, OR Spectr..

[9]  Thorsten Koch,et al.  Rapid mathematical programming , 2005 .

[10]  Ioannis Zyngiridis Optimizing container movements using one and two automated stacking cranes , 2009 .

[11]  K. L. Mak,et al.  Yard crane scheduling in port container terminals , 2005 .

[12]  Udatta S. Palekar,et al.  Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations , 2002, Transp. Sci..

[13]  Robert Stahlbock,et al.  Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals , 2010 .

[14]  Yvo A. Saanen,et al.  Comparison of three automated stacking alternatives by means of simulation , 2005, Proceedings of the Winter Simulation Conference, 2005..

[15]  Kap Hwan Kim,et al.  An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals , 1999, Transp. Sci..