A Hybrid Genetic Algorithm and Parallel Variable Neighborhood Search for Jobshop Scheduling With an Assembly Stage
暂无分享,去创建一个
Samad Ahmadi | Parviz Fattahi | Fatemeh Daneshamooz | Sanaz Keneshloo | S. Ahmadi | P. Fattahi | Sanaz Keneshloo | F. Daneshamooz
[1] Takeshi Yamada,et al. Conventional Genetic Algorithm for Job Shop Problems , 1991, ICGA.
[2] T.C.E. Cheng,et al. Analysis of material flow in a job shop with assembly operations , 1990 .
[3] Rui Zhang. A Simulation-based Genetic Algorithm for Job Shop Scheduling with Assembly Operations , 2011 .
[4] Fariborz Jolai,et al. A variable neighborhood search for job shop scheduling with set-up times to minimize makespan , 2009, Future Gener. Comput. Syst..
[5] D Sculli. Priority dispatching rules in job shops with assembly operations and random delays , 1980 .
[6] T. C. Wong,et al. A comparison of hybrid genetic algorithm and hybrid particle swarm optimization to minimize makespan for assembly job shop , 2013, Appl. Soft Comput..
[7] Erwin Pesch,et al. Evolution based learning in a job shop scheduling environment , 1995, Comput. Oper. Res..
[8] Adam Baharum,et al. A JOB-SHOP SCHEDULING PROBLEM ( JSSP ) USING GENETIC ALGORITHM ( GA ) , 2006 .
[9] Mitsuo Gen,et al. Solving job-shop scheduling problems by genetic algorithm , 1994, Proceedings of IEEE International Conference on Systems, Man and Cybernetics.
[10] Zhenhua Tan,et al. A Hybrid Algorithm to Solve Traveling Salesman Problem , 2012 .
[11] Larry J. Eshelman,et al. Biases in the Crossover Landscape , 1989, ICGA.
[12] Dorothea Heiss-Czedik,et al. An Introduction to Genetic Algorithms. , 1997, Artificial Life.
[13] J. Magalhães-Mendes,et al. A Comparative Study of Crossover Operators for Genetic Algorithms to Solve the Job Shop Scheduling Problem , 2013 .
[14] Mitsuo Gen,et al. Metaheuristics optimization approaches for two-stage reentrant flexible flow shop with blocking constraint , 2015, Expert Syst. Appl..
[15] Chris N. Potts,et al. The Two-Stage Assembly Scheduling Problem: Complexity and Approximation , 1995, Oper. Res..
[16] R. R. Sharapov. Genetic Algorithms: Basic Ideas, Variants and Analysis , 2007 .
[17] Chung-Yee Lee,et al. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .
[18] D. H. Cummings,et al. Minimizing production flow time in a process and assembly job shop , 1998 .
[19] Rui Zhang,et al. A simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardinessobjective , 2011, Comput. Oper. Res..
[20] Mohammad Bagher Fakhrzad,et al. A NEW MULTI-OBJECTIVE JOB SHOP SCHEDULING WITH SETUP TIMES USING A HYBRID GENETIC ALGORITHM , 2013 .
[21] Gerrit Janssens,et al. A Giffler-Thompson focused genetic algorithm for the static job shop scheduling problem , 2007 .
[22] Pierre Hansen,et al. Variable neighborhood search , 1997, Eur. J. Oper. Res..
[23] D. Y. Sha,et al. A hybrid particle swarm optimization for job shop scheduling problem , 2006, Comput. Ind. Eng..