The Relationship of Cpm to Squared Error Loss
暂无分享,去创建一个
The relationship between the capability index Cpm and the expected squared error loss provides an intuitive interpretation of Cpm. By putting the loss in relative terms a user needs only to specify the target and the distance from the target at which th..
[1] Fred A. Spiring,et al. A New Measure of Process Capability: Cpm , 1988 .
[2] Russell A. Boyles,et al. The Taguchi capability index , 1991 .
[3] Victor E. Kane,et al. Process Capability Indices , 1986 .