고속추진기관 시험설비 시운전

Hypersonic engine test facility with ejector system was tested. Ejector system was designed by revised EJSIMP code. The performance of the ejector system was predicted by numerical analysis. As a result, ejector system satisfied the facility design requirement. Based on the pressure level, the facility was successfully started at Mach 3.5 and 20km altitude condition.