A multiproduct EOQ model with inflation, discount, and permissible delay in payments under shortage and limited warehouse space

This study considers a multiproduct economic order quantity problem where delay in payment is permissible and the retailer can benefit cash discounts. The amount of discount and the length of the grace period depend on the order quantity and all the costs increase by an inflation rate. Moreover, the shortage is backlogged and the limited warehouse space leads to a constraint for storage. We first formulate the problem into a non-linear integer-programming model and then we propose a hybrid genetic algorithm and simulated annealing (GA+SA) to solve it. Since there is no benchmark available in the literature, a GA is developed as well to validate the results obtained. The parameters of both algorithms are tuned using the Taguchi method. Finally, numerical examples are solved to evaluate the performances and to compare the efficiency of the two solution procedures.

[1]  Hung-Chang Liao,et al.  An inventory model with deteriorating items under inflation when a delay in payment is permissible , 2000 .

[2]  G. P. Samanta,et al.  Inventory model with two rates of production for deteriorating items with permissible delay in payments , 2011, Int. J. Syst. Sci..

[3]  Hung-po Chao,et al.  The EQQ model with stochastic demand and discounting , 1992 .

[4]  Hark Hwang,et al.  Joint price and lot size determination under conditions of permissible delay in payments and quantity discounts for freight cost , 1996 .

[5]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[6]  Alice E. Smith,et al.  Penalty guided genetic search for reliability design optimization , 1996 .

[7]  Yung-Fu Huang,et al.  Economic order quantity under conditionally permissible delay in payments , 2007, Eur. J. Oper. Res..

[8]  Aysegül Toptal,et al.  Replenishment decisions under an all-units discount schedule and stepwise freight costs , 2009, Eur. J. Oper. Res..

[9]  Charles L. Munson,et al.  Incorporating quantity discounts and their inventory impacts into the centralized purchasing decision , 2010, Eur. J. Oper. Res..

[10]  Leopoldo Eduardo Cárdenas-Barrón,et al.  OPTIMAL ORDER SIZE TO TAKE ADVANTAGE OF A ONE-TIME DISCOUNT OFFER WITH ALLOWED BACKORDERS , 2010 .

[11]  K. S. Chaudhuri,et al.  A deterministic EOQ model with delays in payments and price-discount offers , 2008, Eur. J. Oper. Res..

[12]  S. G. Ponnambalam,et al.  A GA-SA Multiobjective Hybrid Search Algorithm for Integrating Lot Sizing and Sequencing in Flow-Line Scheduling , 2003 .

[13]  Suresh Kumar Goyal,et al.  Determining Economic Maintenance Frequency for a Family of Machines , 1985 .

[14]  C. Jaggi,et al.  A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive , 2003 .

[15]  M. Hariga Effects of inflation and time-value of money on an inventory model with time-dependent demand rate and shortages , 1995 .

[16]  Anders Segerstedt,et al.  Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand , 2005 .

[17]  J. Bather A continuous time inventory model , 1966, Journal of Applied Probability.

[18]  Jinn-Tsair Teng,et al.  An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity , 2009, Eur. J. Oper. Res..

[19]  Keisuke Matsuyama The EOQ-Models modified by introducing discount of purchase price or increase of setup cost , 2001 .

[20]  Abraham Mendoza,et al.  Incorporating quantity discounts to the EOQ model with transportation costs , 2008 .

[21]  B. Sarker,et al.  Optimal ordering policies in response to a discount offer , 2006 .

[22]  Emanuele Borgonovo,et al.  Sensitivity analysis with finite changes: An application to modified EOQ models , 2010, Eur. J. Oper. Res..

[23]  S. Goyal Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .