High-speed rail transport valuation

In this paper, the optimal timing for investing in high-speed rail projects under uncertainty in relation to the utility provided to railway users was investigated. To accomplish this, a continuous time real options analysis framework using a stochastic demand model was developed to determine the optimal time to invest. Uncertainty upon investment expenditures was also added in an extended framework. The value of the option to defer and the investment opportunity value were also assessed.

[1]  Eduardo S. Schwartz,et al.  Evaluating Natural Resource Investments , 1985 .

[2]  L. Trigeorgis Real Options: Managerial Flexibility and Strategy in Resource Allocation , 1996 .

[3]  A. Dixit Entry and Exit Decisions under Uncertainty , 1989, Journal of Political Economy.

[4]  A. D. Owen,et al.  The characteristics of railway passenger demand. An econometric investigation. , 1987 .

[5]  Sarah M. Ryan,et al.  On The Validity of The Geometric Brownian Motion Assumption , 2005 .

[6]  Peter Tufano,et al.  When are Real Options Exercised? An Empirical Study of Mine Closings , 2000 .

[7]  B. Øksendal Stochastic differential equations : an introduction with applications , 1987 .

[8]  Sheldon M. Ross,et al.  Stochastic Processes , 2018, Gauge Integral Structures for Stochastic Calculus and Quantum Electrodynamics.

[9]  E. Prescott,et al.  Investment Under Uncertainty , 1971 .

[10]  Simon Rose,et al.  Valuation of Interacting Real Options in a Tollroad Infrastructure Project , 1998 .

[11]  Han T. J. Smit,et al.  Infrastructure Investment as a Real Options Game: The Case of European Airport Expansion , 2003 .

[12]  David Shilton Modelling the Demand for High Speed Train Services , 1982 .

[13]  Mark Wardman,et al.  FORECASTING THE IMPACT OF SERVICE QUALITY CHANGES ON THE DEMAND FOR INTER-URBAN RAIL TRAVEL / , 1994 .

[14]  T. Copeland Real Options: A Practitioner's Guide , 2001 .

[15]  S. Shreve,et al.  Stochastic differential equations , 1955, Mathematical Proceedings of the Cambridge Philosophical Society.

[16]  S. Myers Determinants of corporate borrowing , 1977 .

[17]  D. Siegel,et al.  Option Valuation of Claims on Real Assets: The Case of Offshore Petroleum Leases , 1988 .

[18]  Mark Wardman,et al.  INTER-URBAN RAIL DEMAND, ELASTICITIES AND COMPETITION IN GREAT BRITAIN: EVIDENCE FROM DIRECT DEMAND MODELS , 1997 .

[19]  H. Baum,et al.  無料公共輸送(Journal of Transport Economics and Policy,Jan.1973) , 1973 .

[20]  R. Pindyck Irreversibility, Uncertainty, and Investment , 1990 .

[21]  Michael Bowe,et al.  Project evaluation in the presence of multiple embedded real options: evidence from the Taiwan High-Speed Rail Project , 2004 .

[22]  Jim Freeman,et al.  Stochastic Processes (Second Edition) , 1996 .

[23]  K. Mckenzie,et al.  Damned if you do, damned if you don't: an option value approach to evaluating the subsidy of the CPR mainline , 1996 .

[24]  Dean Paxson,et al.  Rivalry under price and quantity uncertainty , 2005 .

[25]  N. A. Nichols Scientific management at Merck: An interview with CFO Judy Lewent , 1994 .

[26]  R. McDonald,et al.  The Value of Waiting to Invest , 1982 .

[27]  G. Friedl Copeland, Tom/Antikarov, Vladimir, Real Options. A Practitioner’s Guide, Texere LLC, New York 2001, $ 59,95 , 2002 .