Purpose – The objectives of this paper are to discuss the constraints stemming from the unstructured nature of the cost estimation practice in Turkey and introduce a generic computer aided building cost estimation model based on a cost significant technique for Turkish construction sector public projects in its detailed design phase.Design/methodology/approach – The research design was based on the simplified version of the bill of quantities method and a cost significant estimating model works on a cost database was suggested to overcome the problems. Underlying principles and basic steps of cost estimation based on cost significant work packages was explained by means of manual calculations.Findings – In order to automate the manual building cost estimation process, the software based on cost significant work packages was developed.Research limitations/implications – The software is currently in the testing phase and is being used for educational purposes. Making use of both public sector and current ma...
[1]
Peter Edwards,et al.
A price-rationalized approach to item separation in the measurement of concrete work
,
1995
.
[2]
Malcolm Horner,et al.
Characteristic items - a new approach to pricing and controlling construction projects
,
1996
.
[3]
A. K. Munns,et al.
Estimating using cost significant global cost models
,
2000
.
[4]
Akintola Akintoye,et al.
Analysis of factors influencing project cost estimating practice
,
2000
.
[5]
R. M. W. Horner,et al.
Beyond BRIDGET ― an integrated model for estimating and controlling reinforced concrete bridge construction costs and durations
,
1993
.
[6]
M Murray,et al.
BRIDGET - A COST ESTIMATING SUITE FOR HIGHWAY STRUCTURES
,
1990
.
[7]
Douglas J. Ferry.
Cost Planning of Buildings
,
1980
.