A framework for understanding waste management studies in construction.

During the past decades, construction and demolition (C&D) waste issues have received increasing attention from both practitioners and researchers around the world. A plethora of research relating to C&D waste management (WM) has been published in scholarly journals. However, a comprehensive understanding of the C&D WM research is somehow absent in spite of its proliferation. The aim of this paper is to develop a framework that helps readers understand the C&D WM research as archived in selected journals. Papers under the topic of C&D WM are retrieved based on a set of rigorous procedures. The information of these papers is then analyzed with the assistance of the Qualitative Social Research (QSR) software package NVivo. A framework for understanding C&D WM research is created based on the analytic results. By following the framework, a bibliometric analysis of research in C&D WM is presented, followed by an in-depth literature analysis. It is found that C&D generation, reduction, and recycling are the three major topics in the discipline of C&D WM. Future research is recommended to (a) investigate C&D waste issues in wider scopes including design, maintenance and demolition, (b) develop a unified measurement for waste generation so that WM performance can be compared across various economies, and (c) enhance effectiveness of WM approaches (e.g. waste charging scheme) based on new WM concepts (e.g. Extended Producer Responsibility). In addition to the above research findings, the approach for producing the research framework can be useful references for other studies which attempt to understand the research of a given discipline.

[1]  Vivian W. Y Tam,et al.  An investigation of construction wastes: an empirical study in Shenzhen , 2008 .

[2]  G Bianchini,et al.  Recycling of construction and demolition waste materials: a chemical-mineralogical appraisal. , 2005, Waste management.

[3]  Martin Loosemore,et al.  A theory of waste behaviour in the construction industry , 2001 .

[4]  Ming Lu,et al.  Application Framework for Mapping and Simulation of Waste Handling Processes in Construction , 2006 .

[5]  Jane L Hao,et al.  The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme , 2008, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[6]  C. Poon Reducing construction waste. , 2007, Waste management.

[7]  Paul S Phillips,et al.  Waste management issues for the UK ready-mixed concrete industry , 2001 .

[8]  Chi Sun Poon,et al.  Minimizing demolition wastes in Hong Kong public housing projects , 2004 .

[9]  Chi Sun Poon,et al.  Reducing building waste at construction sites in Hong Kong , 2004 .

[10]  Nilay Cosgun,et al.  A study conducted to reduce construction waste generation in Turkey , 2007 .

[11]  Bernadette O’Regan,et al.  A model for assessing the economic viability of construction and demolition waste recycling—the case of Ireland , 2006 .

[12]  Christer Sjöström,et al.  CIB Agenda 21 for sustainable construction: why, how and what , 1999 .

[13]  Y. Y. Ling,et al.  Reusing timber formwork: importance of workmen’s efficiency and attitude , 2000 .

[14]  Rawshan Ara Begum,et al.  A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .

[15]  Dubravka Bjegović,et al.  Construction and demolition waste management system , 2008 .

[16]  Vivian W Y Tam,et al.  On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.

[17]  A. Seydel,et al.  FINANCIAL EVALUATION OF WASTE MANAGEMENT METHODS: A CASE STUDY , 2002 .

[18]  Yew-Chaye Loo,et al.  On the prevailing construction waste recycling practices: a South East Queensland study , 2009, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[19]  E. R. Skoyles,et al.  Materials wastage – a misuse of resources , 1976 .

[20]  Chi Sun Poon,et al.  The use of recycled aggregate in concrete in Hong Kong , 2007 .

[21]  Vivian W. Y Tam,et al.  Economic comparison of concrete recycling : a case study approach , 2008 .

[22]  Stefan Salhofer,et al.  Modelling municipal solid waste generation: a review. , 2008, Waste management.

[23]  Chi Ming Tam,et al.  Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations , 2007 .

[24]  Weisheng Lu,et al.  A model for cost-benefit analysis of construction and demolition waste management throughout the waste chain , 2011 .

[25]  Rawshan Ara Begum,et al.  Implementation of waste management and minimisation in the construction industry of Malaysia , 2007 .

[26]  Peter E.D. Love,et al.  AN ANALYSIS OF FACTORS INFLUENCING WASTE MINIMISATION AND USE OF RECYCLED MATERIALS FOR THE CONSTRUCTION OF RESIDENTIAL BUILDINGS , 2003 .

[27]  Chi Ming Tam,et al.  A review on the viable technology for construction waste recycling , 2006 .

[28]  M Osmani,et al.  Architects' perspectives on construction waste reduction by design. , 2008, Waste management.

[29]  Chi Sun Poon,et al.  Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .

[30]  Lucio Soibelman,et al.  Material Waste in Building Industry: Main Causes and Prevention , 2002 .

[31]  O. O. Faniran,et al.  Minimizing waste on construction project sites , 1998 .

[32]  Abdol R. Chini,et al.  DECONSTRUCTION AS AN ESSENTIAL COMPONENT OF SUSTAINABLE CONSTRUCTION , 2001 .

[33]  Shabbir H Gheewala,et al.  Estimation of construction waste generation and management in Thailand. , 2009, Waste management.

[34]  John F. Williams,et al.  Approaches to Implementing Solid Waste Recycling Facilities , 2012 .

[35]  Guinevere Gilbert,et al.  Improving solid waste reduction and recycling performance using goal setting and feedback , 2001 .

[36]  Rawshan Ara Begum,et al.  Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors. , 2007, Waste management.

[37]  Martin Betts,et al.  Construction Management and Economics: A review of the first ten years , 1993 .

[38]  Vivian W. Y Tam,et al.  A checklist for assessing sustainability performance of construction projects , 2007 .

[39]  Vivian W. Y Tam,et al.  Evaluations of existing waste recycling methods: A Hong Kong study , 2006 .

[40]  Andrew N. Baldwin,et al.  Reducing waste in high rise residential building by information modelling at the design stage , 2007 .

[41]  Andrew N. Baldwin,et al.  Modelling design information to evaluate pre-fabricated and pre-cast design solutions for reducing construction waste in high rise residential buildings , 2008 .

[42]  G. Ofori The environment: the fourth construction project objective? , 1992 .

[43]  G. Brundtland,et al.  Our common future , 1987 .

[44]  H. Johnston,et al.  Cost-effective waste minimization for construction managers , 1995 .

[45]  Charles J. Kibert,et al.  Strategies for successful construction and demolition waste recycling operations , 1997 .

[46]  Sudhir Misra,et al.  Use of aggregates from recycled construction and demolition waste in concrete , 2007 .

[47]  J.L. Hao,et al.  A simulation model using system dynamic method for construction and demolition waste management in Hong Kong , 2007 .

[48]  A Craighill,et al.  A lifecycle assessment and evaluation of construction and demolition waste , 1999 .

[49]  Weisheng Lu,et al.  An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.

[50]  Rawshan Ara Begum,et al.  Attitude and behavioral factors in waste management in the construction industry of Malaysia , 2009 .

[51]  Zhen Chen,et al.  Environmental management of urban construction projects in China , 2000 .

[52]  Edward J. Jaselskis,et al.  Analysis of Trends in Construction Research: 1985-2002 , 2004 .

[53]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .

[54]  Cornelia Züll,et al.  A review of software for text analysis , 1999 .

[55]  Nadeem Khalil,et al.  A case of a municipal solid waste management system for a medium‐sized Indian city, Aligarh , 2009 .

[56]  Chi Sun Poon,et al.  Management of construction waste in public housing projects in Hong Kong , 2004 .

[57]  C. M. Tam,et al.  Mapping Approach for Examining Waste Management on Construction Sites , 2004 .

[58]  Margaret Volante Qualitative research. , 2008, Nurse researcher.

[59]  Ronald L. Jackson,et al.  What Is Qualitative Research? , 2007 .

[60]  Mark Smithers,et al.  Implementing a waste management plan during the construction phase of a project: a case study , 1998 .

[61]  Luis F. Alarcón,et al.  Construction process improvement methodology for construction projects , 1998 .

[62]  Konstantinos Moustakas,et al.  Generation and management of construction and demolition waste in Greece—an existing challenge , 2003 .

[63]  C F Mahler,et al.  Evaluation of investments in recycling centres for construction and demolition wastes in Brazilian municipalities. , 2007, Waste management.

[64]  George Ofori,et al.  Building waste assessment score: design-based tool , 2004 .