Model Test for Crane Installation of Subsea Equipment in Deep Water
暂无分享,去创建一个
[1] Sa Young Hong,et al. Effects of Passive and Active Heave Compensators on Deepwater Lifting Operation , 2013 .
[2] G. F. Clauss,et al. Subharmonic Oscillations of Moored Floating Cranes , 2000 .
[3] Radboud van Dijk,et al. Offshore Monitoring Campaign on Installation of Suction Piles in Deep Water Fields , 2011 .
[4] M. Agrawal,et al. Fluid-Structure Interaction: Lowering Subsea Structure / Equipment in Splash Zone During Installation , 2014 .
[5] Jun Wang,et al. Technical Challenges and Success for Rigid Pipeline with PLET, Jumper and Flying Leads Installation in Conger 9 Field , 2011 .
[6] B. Nam,et al. An Experimental Study on Deepwater Crane Installation of Subsea Equipment in Waves , 2015 .
[7] Jue Wang,et al. Criteria for the Operation of Lowering a Structure to the seabed based on the Installation Vessel Motion , 2011 .
[8] Mehrdad Kimiaei,et al. Comparing the Results of a Simplified Numerical Model With DNV Guidelines for Installation of Subsea Platforms , 2009 .