Optimal Project Scheduling with Materials Ordering
暂无分享,去创建一个
[1] James R. Evans. An efficient implementation of the Wagner-Whitin algorithm for dynamic lot-sizing , 1985 .
[2] James H. Patterson,et al. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .
[3] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .
[4] Dwight E. Smith-Daniels,et al. Finding lot sizes for materials used in projects , 1986 .
[5] B. M. Khumawala,et al. A requirements planning system for the Space Shuttle Operations schedule , 1980 .
[6] N. J. Aquilano,et al. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning , 1980 .
[7] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[8] David Burden,et al. Production-Inventory Systems: Planning and Control , 1979 .
[9] A. H. Russell. Cash Flows in Networks , 1970 .
[10] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[11] Richard C. Grinold,et al. The payment scheduling problem , 1972 .
[12] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[13] Dwight E. Smith-Daniels,et al. Constrained resource project scheduling subject to material constraints , 1984 .
[14] J. Patterson,et al. Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach , 1977 .
[15] William L. Berry,et al. Manufacturing Planning and Control Systems , 1984 .