New validations of PERT times
暂无分享,去创建一个
[1] T. K. Littlefield,et al. PERT Duration Times: Mathematics or MBO , 1991 .
[2] Frank E. Grubbs. Letter to the Editor---Attempts to Validate Certain PERT Statistics or “Picking on PERT” , 1962 .
[3] K. C. Chae. A geometric interpretation of the PERT assumptions on the activity time , 1990 .
[4] D. Keefer,et al. Better estimation of PERT activity time parameters , 1993 .
[5] Hon-Shiang Lau,et al. A proposal on improved procedures for estimating task-time distributions in PERT , 1995 .
[6] D Sculli,et al. A historical note on PERT times , 1989 .
[7] Terence Williams. What are PERT Estimates? , 1995 .
[8] Charles A. Gallagher,et al. Reply-A Note on PERT Assumptions , 1987 .
[9] T. K. Littlefield,et al. Reply-An Answer to Sasieni's Question on PERT Times , 1987 .
[10] M W Sasieni,et al. A note on PERT times , 1986 .
[11] Genaro J. Gutierrez,et al. Parkinson's Law and Its Implications for Project Management , 1991 .
[12] N. L. Johnson,et al. Continuous Univariate Distributions. , 1995 .
[13] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[14] Nicholas R. Farnum,et al. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .
[15] D. Golenko-Ginzburg. On the Distribution of Activity Time in PERT , 1988 .
[16] Kyung-Chul Chae,et al. Estimating the Mean and Variance of PERT Activity Time Using Likelihood-Ratio of the Mode and the Midpoint , 1990 .
[17] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[18] Charles E. Clark,et al. Letter to the Editor—The PERT Model for the Distribution of an Activity Time , 1962 .
[19] Lloyd A. Swanson,et al. IMPLICATIONS OF THE UNDERLYING ASSUMPTIONS OF PERT , 1971 .
[20] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[21] D Golenko-Ginzburg,et al. PERT assumptions revisited , 1989 .
[22] Soumyo Moitra,et al. Skewness and the Beta Distribution , 1990 .