Development and Application of an Integrated Optimization-Simulation Model for Major Irrigation Projects

A nonlinear, constrained multivariable optimization routine is developed for deciding the optimal canal water release and linked to a canal hydraulic module (MIKE 11) and command hydrological module (MIKE SHE). The optimization routine is solved using the sequential quadratic programming (SQP) technique. The hydraulic and the hydrological modules are calibrated and validated independently, and the results are found to be satisfactory. The integrated optimization-simulation model is applied to the Right Bank Main Canal System of Kangsabati Irrigation Project, West Bengal, India. An improved rotational delivery schedule based on long-term field data analysis is also developed. Three simulation scenarios are considered. These are (1) MIKE 11 and MIKE SHE simulation, (3) integrated optimization simulation, and (3) integrated optimization-simulation with improved schedule. Simulations were performed for Kharif (rainy) irrigation periods for 3 different years (1995–1997). The intercomparison of the three simula...

[1]  Robert Chambers Managing Canal Irrigation: Practical Analysis from South Asia , 1989 .

[2]  M. A. Chitale,et al.  Irrigation for poverty alleviation , 1994 .

[3]  Maynard M. Hufschmidt,et al.  A Conceptual Framework for Analysis of Water Resources Management in Asia , 1984 .

[4]  P. P. Mujumdar,et al.  Real‐time reservoir operation for irrigation , 1997 .

[5]  J. Doorenbos,et al.  Yield response to water , 1979 .

[6]  K. Venugopal,et al.  Optimal Operation of South Indian Irrigation Systems , 1998 .

[7]  D. H. Manz,et al.  Optimal operation of irrigation canal systems using nonlinear programming - Dynamic simulation model , 1992 .

[8]  Robert W. Hill,et al.  LP Operation Model for On‐Demand Canal Systems , 1989 .

[9]  K. Kristensen,et al.  A MODEL FOR ESTIMATING ACTUAL EVAPOTRANSPIRATION FROM POTENTIAL EVAPOTRANSPIRATION , 1975 .

[10]  Narendra Singh Raghuwanshi,et al.  Hydraulic Modeling of Kangsabati Main Canal for Performance Assessment , 2001 .

[11]  P. P. Mujumdar,et al.  Optimal reservoir operation for irrigation of multiple crops , 1992 .

[12]  Pushpa Raj Onta,et al.  Groundwater management models for Asian developing countries , 1994 .

[13]  Drainage Division,et al.  Criteria for Evaluation of Watershed Models , 1993 .

[14]  Narendra Singh Raghuwanshi,et al.  Alternative Delivery Scheduling for Improved Canal System Performance , 2002 .

[15]  Asit K. Biswas Considerations for sustainable irrigation development in Asia , 1994 .

[16]  null null,et al.  Unsteady‐Flow Modeling of Irrigation Canals , 1993 .

[17]  John W. Labadie,et al.  Optimal Nonlinear Predictive Control for Canal Operations , 1997 .

[18]  Barry J. Adams,et al.  Stochastic Optimization of Multi Reservoir Systems Using a Heuristic Algorithm: Case Study From India , 1996 .

[19]  S. Vedula,et al.  An Integrated Model for Optimal Reservoir Operation for Irrigation of Multiple Crops , 1996 .