The influence of historical conditions on time and cost of construction project

Conducting construction works in a building or in an area entered in the historic register is associated with the contracting authority's risk of incurring higher than planned costs of works, as well as delays in their implementation. In many cases, these deviations are completely independent of contracting authority and contractor. The aim of this article is to indicate the reasons for cost and time changes in the construction project, which is influenced by the historical conditions of the building site's location. In practice, the detailed considerations presented in the article may contribute to increasing the efficiency of spending public funds in the implementation of construction projects of a specific nature. Based on the selected example reconstruction of the Old Pharmacy building located in the historic part of the old city of Gda ńsk, the authors analyze and classify factors affecting the cost and time of construction works taking into account the historical conditions of the location of the facility. © 2018 The Authors. Published by Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2018.

[1]  Per-Erik Josephson,et al.  Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications , 2017 .

[2]  Abd Halid Abdullah,et al.  Theoretical framework of the causes of construction time and cost overruns , 2017 .

[3]  Agnieszka Leśniak,et al.  Construction Delays in Clients Opinion – Multivariate Statistical Analysis , 2015 .

[4]  Shabbab Al Hammadi,et al.  Study of Delay Factors in Construction Projects , 2016 .

[5]  Hesham S. Ahmad,et al.  Delay and Cost Overrun in Infrastructure Projects in Jordan , 2017 .

[6]  Agata Siemaszko,et al.  Risk Modelling with Bayesian Networks - Case Study: Construction of Tunnel under the Dead Vistula River in Gdansk☆ , 2017 .

[7]  Artur Zbiciak,et al.  Przyczyny powstawania opóźnień w realizacji kontraktów budowlanych - analiza wstępnych wyników badania ankietowego , 2013 .

[8]  Göran Lindahl,et al.  Implications of Cost Overruns and Time Delays on Major Public Construction Projects , 2015 .

[9]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[10]  Noel Painting,et al.  Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan , 2017 .

[11]  E. Plebankiewicz,et al.  Opóźnienia w robotach budowlanych , 2010 .

[12]  Kazimierz Jamroz,et al.  Methods of estimating the cost of traffic safety equipment’s life cycle , 2017 .

[13]  Dariusz Kowalski,et al.  The Cost Analysis of Corrosion Protection Solutions for Steel Components in Terms of the Object Life Cycle Cost , 2017 .

[14]  Søren Wandahl,et al.  Exploration of the reasons for delays in construction , 2014 .

[15]  Gul Polat,et al.  Factors Affecting Cost Overruns in Micro-scaled Construction Companies , 2014 .

[16]  Ahmed Senouci,et al.  Time Delay and Cost Overrun in Qatari Public Construction Projects , 2016 .