Application of Big Filled Bags to the Approach Embankment of Phase One Project, Huanghua Port

The conditions of study and application of big bag structure filled with clayey sand to the approach embankment of Phase One Porject, Huanghua Port were emphatically introduced in the paper and the inquiry on some technical problems of design and construction and the proposals were also given in the paper.