Discrete Lot Streaming In Two-Machine Flow Shops

22 leaves ; Includes bibliographical references (leaves 20-22). ; "April, 1995." ; This research was supported in part by the Natural Sciences and Engineering Research Council of Canada under Grant No.OGP0001798.

[1]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[2]  Stephen C. Graves,et al.  Overlapping operations in material requirements planning , 1986 .

[3]  Kalyan Moy Gupta,et al.  A connectionist approach for similarity assessment in case-based reasoning systems , 1997, Decis. Support Syst..

[4]  Chris N. Potts,et al.  Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .

[5]  R. Love,et al.  Generalized hull properties for location problems , 1995 .

[6]  Jaya P. Moily,et al.  Optimal and heuristic procedures for component log-splitting in multi-stage manufacturing systems , 1986 .

[7]  Norman P. Archer,et al.  Self-organizing feature maps: the traveling salesman problem and other applications , 1993 .

[8]  Kenneth R. Baker,et al.  Basic Techniques for Lot Streaming , 1993, Oper. Res..

[9]  Michael Piczak,et al.  Settlement Rates and Settlement Stages in Compulsory Interest Arbitration , 1996 .

[10]  C. Monma,et al.  A concise survey of efficiently solvable special cases of the permutation flow-shop problem , 1983 .

[11]  George Steiner,et al.  Lot streaming with attached setups in three-machine flow shops , 1998 .

[12]  Kenneth R. Baker,et al.  Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..

[13]  Norman P. Archer,et al.  A fuzzy decision making model , 1994 .

[14]  Harish C. Jain,et al.  Affirmative Action in Employment for the Scheduled Castes and the Scheduled Tribes in India , 1994 .

[15]  F. Can Çinkaya,et al.  Unit sized transfer batch scheduling with setup times , 1992 .

[16]  F. Robert Jacobs,et al.  REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .

[17]  S. Reiter A System for Managing Job-Shop Production , 1966 .

[18]  Jiang Chen,et al.  Lot streaming with attached setups in three-machine flow shops , 1997 .

[19]  A. Montazemi,et al.  An Empirical Investigation of CBI in Support of Mastery Learning , 1995 .

[20]  Kalyan Moy Gupta,et al.  Empirical evaluation of retrieval in case-based reasoning systems using modified cosine matching function , 1997, IEEE Trans. Syst. Man Cybern. Part A.

[21]  Thomas E. Muller,et al.  Measuring Values in International Settings: Are Respondents Thinking "Real" Life or "Ideal" Life? , 1996 .

[22]  Ferda Can Çetinkaya,et al.  Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .

[23]  Harish C. Jain,et al.  Bill 40 amendments to Ontario Labour Relations Act: an overview and evaluation , 1993 .

[24]  Kalyan Moy Gupta,et al.  An adaptive agent for case description in diagnostic CBR systems , 1996 .

[25]  A. Z. Szendrovits Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .

[26]  R. Cooper Third‐Generation New Product Processes , 1994 .

[27]  Dan Triesch,et al.  Polynomial Transfer Lot Sizing Techniques for Batch Processing on Consecutive Machines , 1989 .

[28]  R. Vickson Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .

[29]  G. Steiner,et al.  BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .

[30]  Kalyan Moy Gupta,et al.  A framework for retrieval in case-based reasoning systems , 1997, Ann. Oper. Res..

[31]  R. G. Vickson,et al.  Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .