Discrete Lot Streaming In Two-Machine Flow Shops
暂无分享,去创建一个
[1] Chris N. Potts,et al. Flow shop scheduling with lot streaming , 1989 .
[2] Stephen C. Graves,et al. Overlapping operations in material requirements planning , 1986 .
[3] Kalyan Moy Gupta,et al. A connectionist approach for similarity assessment in case-based reasoning systems , 1997, Decis. Support Syst..
[4] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[5] R. Love,et al. Generalized hull properties for location problems , 1995 .
[6] Jaya P. Moily,et al. Optimal and heuristic procedures for component log-splitting in multi-stage manufacturing systems , 1986 .
[7] Norman P. Archer,et al. Self-organizing feature maps: the traveling salesman problem and other applications , 1993 .
[8] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[9] Michael Piczak,et al. Settlement Rates and Settlement Stages in Compulsory Interest Arbitration , 1996 .
[10] C. Monma,et al. A concise survey of efficiently solvable special cases of the permutation flow-shop problem , 1983 .
[11] George Steiner,et al. Lot streaming with attached setups in three-machine flow shops , 1998 .
[12] Kenneth R. Baker,et al. Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..
[13] Norman P. Archer,et al. A fuzzy decision making model , 1994 .
[14] Harish C. Jain,et al. Affirmative Action in Employment for the Scheduled Castes and the Scheduled Tribes in India , 1994 .
[15] F. Can Çinkaya,et al. Unit sized transfer batch scheduling with setup times , 1992 .
[16] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[17] S. Reiter. A System for Managing Job-Shop Production , 1966 .
[18] Jiang Chen,et al. Lot streaming with attached setups in three-machine flow shops , 1997 .
[19] A. Montazemi,et al. An Empirical Investigation of CBI in Support of Mastery Learning , 1995 .
[20] Kalyan Moy Gupta,et al. Empirical evaluation of retrieval in case-based reasoning systems using modified cosine matching function , 1997, IEEE Trans. Syst. Man Cybern. Part A.
[21] Thomas E. Muller,et al. Measuring Values in International Settings: Are Respondents Thinking "Real" Life or "Ideal" Life? , 1996 .
[22] Ferda Can Çetinkaya,et al. Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .
[23] Harish C. Jain,et al. Bill 40 amendments to Ontario Labour Relations Act: an overview and evaluation , 1993 .
[24] Kalyan Moy Gupta,et al. An adaptive agent for case description in diagnostic CBR systems , 1996 .
[25] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[26] R. Cooper. Third‐Generation New Product Processes , 1994 .
[27] Dan Triesch,et al. Polynomial Transfer Lot Sizing Techniques for Batch Processing on Consecutive Machines , 1989 .
[28] R. Vickson. Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .
[29] G. Steiner,et al. BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .
[30] Kalyan Moy Gupta,et al. A framework for retrieval in case-based reasoning systems , 1997, Ann. Oper. Res..
[31] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[32] Chris N. Potts,et al. Lot streaming in three-stage production processes , 1994 .