From Task Allocation Towards Resource Allocation when Optimising Assembly Systems

The article discusses the question; is it possible to reach route flexibility and system proactivity through resource allocation and task optimisation. In order to answer this, differences between three types of optimisation regarding task and resource allocation are discussed: Global Task and Resource optimisation, Task optimisation and local resource allocation, but with resource alternatives, Task optimisation and local resource allocation (optimisation), with prioritised resources, shown as a possible solution in this paper in order to increase the route flexibility and proactivity in the system planning. An example of the last approach will be shown using a logic language (SOP) with help of software tool called Sequence Planner (SP).

[1]  S. Parker,et al.  A new model of work role performance: Positive behavior in uncertain and interdependent contexts , 2007 .

[2]  Steven R. Rasmussen,et al.  Task allocation for wide area search munitions , 2002, Proceedings of the 2002 American Control Conference (IEEE Cat. No.CH37301).

[3]  Kathryn E. Stecke,et al.  Classification of flexible manufacturing systems , 2011 .

[4]  Miguel Toro,et al.  A MODEL FOR ASSEMBLY SEQUENCE PLANNING IN A MULTIROBOT ENVIRONMENT , 2002 .

[5]  Jessica Bruch,et al.  Designing proactive assembly systems – Criteria and interaction between automation, information, and competence , 2009 .

[6]  Wesley W. Chu,et al.  Task Allocation in Distributed Data Processing , 1980, Computer.

[7]  Andrew V. Goldberg,et al.  Quincy: fair scheduling for distributed computing clusters , 2009, SOSP '09.

[8]  Raj Jain,et al.  A Quantitative Measure Of Fairness And Discrimination For Resource Allocation In Shared Computer Systems , 1998, ArXiv.

[9]  Chris Baber,et al.  Validating task analysis for error identification: reliability and validity of a human error prediction technique , 2005, Ergonomics.

[10]  Sarit Kraus,et al.  Methods for Task Allocation via Agent Coalition Formation , 1998, Artif. Intell..

[11]  Johan Stahre,et al.  Development of production cells with regard to physical and cognitive automation: A decade of evolution , 2011, 2011 IEEE International Symposium on Assembly and Manufacturing (ISAM).

[12]  Christopher D. Wickens,et al.  Humans: Still Vital After All These Years of Automation , 2008, Hum. Factors.

[13]  J M Hoc,et al.  From human – machine interaction to human – machine cooperation , 2000, Ergonomics.

[14]  George Chryssolouris,et al.  Manufacturing Systems: Theory and Practice , 1992 .

[15]  Delbert Tesar,et al.  Meeting Human Needs While Reducing Human Drudgery , 2004 .

[16]  D. Gerwin Manufacturing flexibility: a strategic perspective , 1993 .

[17]  S. Jack Hu,et al.  A complexity model for sequence planning in mixed-model assembly lines , 2012 .

[18]  Raja Parasuraman,et al.  Humans and Automation: Use, Misuse, Disuse, Abuse , 1997, Hum. Factors.

[19]  Bengt Lennartson,et al.  Human operator and robot resource modeling for planning purposes in assembly systems , 2012 .

[20]  Johan Stahre,et al.  Concept model towards optimising Levels of Automation (LoA) in assembly systems , 2010 .

[21]  M. Frese,et al.  4. Personal initiative: An active performance concept for work in the 21st century , 2001 .

[22]  Chris W. Clegg,et al.  A critical assessment of task allocation methods and their applicability , 1997 .

[23]  Thomas B. Sheridan Human centered automation: oxymoron or common sense? , 1995, 1995 IEEE International Conference on Systems, Man and Cybernetics. Intelligent Systems for the 21st Century.

[24]  Zhou Xiaoming,et al.  A Model Based Approach to Assembly Sequence Planning , 2007, 2007 International Conference on Mechatronics and Automation.

[25]  Steven J. Landry,et al.  Roadmap for the next generation of dynamic function allocation theories and strategies , 2011 .

[26]  Bengt Lennartson,et al.  Sequence Planning for Integrated Product, Process and Automation Design , 2010, IEEE Transactions on Automation Science and Engineering.

[27]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[28]  Stig-Arne Mattsson Logistikens termer och begrepp , 2004 .

[29]  Johan Stahre,et al.  Analysing changeability and time parameters due to levels of Automation in an assembly system , 2008 .

[30]  Knut Åkesson,et al.  Modeling of discrete event systems using finite automata with variables , 2007, 2007 46th IEEE Conference on Decision and Control.

[31]  N. Jordan Allocation of functions between man and machines in automated systems. , 1963 .

[32]  Johan Stahre,et al.  Measuring and analysing Levels of Automation in an assembly system , 2008 .

[33]  Bengt Lennartson,et al.  Planning transport sequences for flexible manufacturing systems , 2011 .

[34]  Chris W. Clegg,et al.  A Sociotechnical Method for Designing Work Systems , 2002, Hum. Factors.